Thanks, Michael.
to slide Moving X.
I spaceship over on we've provide testing have past be taken months, it to the steps the year. to the over Before helpful the the two modifications would and discuss made program past background we
continuous of know, testing you is As to improvement. be designed our a process program
and improved the phase We Unity. we of with one enhancements of for flight controls architecture main that and to system upgrade powered the system opportunity rocket control flight, and of harnesses The the which spaceship The to control improve That changes used we of for the data, program new spaceflight and is upgraded change in target the Unity. an Last current each the have wiring surfaces forward. is that computer summer, objectives every stations. our in on gather horizontal performance test a light during future the performance some to stabilizers are them control move computers the consisted an two flight. for provided allows VSS boost
themselves. the on graphic cabin actuators in the there next driven results. located last with the motor stabilizers in electric great were control upgrades right the the and at computers tail to Spaceport year the These booms see on flights horizontal can slide during are and are within America glide X, tested you As ground
system triggered know, on the testing rocket hardware. have our connection. The in flight motor motor powered lost would final system cause of tested computer as the flight new that was control commands elevated issue unintended The a was program Our to the an you rocket generated that computer. XXXX it EMI. December step new the motor to abort EMI. computer the feedback of was interference, pilot was rocket The failsafe and is electromagnetic translate commands those of source the or boost into motor when inputs But electric of move designed EMI during that a
reaching this us space, was issue. safety from While prevented not a it
in the to measured conditions to difficult and actual the can safely and has designed. systems flight and EMI not that aerospace Our approach runway is to the our uncommon managing pilots be been it systems given returned methodical ground. replicate on as
working to resolve issue spaceship. our focusing been we've quarter, major elements on the two past diligently the Over within
the that We it First, we the new EMI being to addressed entering filters ever source, the This system the at EMI into flight the being itself. computer the in control first change hardware within EMI reduces stopping generated the suppress is larger drastically the from generated of computer. by amount added place.
added that Second, to we improved EMI. back power, made wire were that harness suppress transmit changes computer. components and the the carry wires to to the measurement as shielding the control These signal wires data flight as conductive well
to systematic, the troubleshoot EMI well refine our Our focused solutions to of spaceship on able possible. much work as were as as We as rapidly approach our lab in approach. eliminating develop and on the to and been test both prototype has
decibels. flight were XX end end the final is As hardware to see complete, of and we XX EMI checkouts, the that to current and compare order installation the an to to previous the of we of we've on significantly able levels, reduced can today, the EMI
logarithmic not scale. if Now terminology, are you're noise familiar decibels on of a measured with measurement a the intensity
reduction EMI XX was over So is of intensity a decibels means a XX XX% that we've level reduced to to before. that than it lower the
thank that fantastic take issue is and addressing and that this flight start diligence to I EMI and reduce sufficiently want Our check. support engineers, for we moment Unity its mechanics ready and a of our hard incredible to concluded of have result. staff for team work led their pre-flight launch the to if
past part America program of two the mothership as for we New VMS three conducted Spaceport the from weeks flights readiness with in next our Eve our spaceflight, Mexico. Now over also
identify perform aircraft. may For that our meticulous perform protocols, flight inspection an post maintenance we other to any we after to among each standard need on a flight things,
last and and tear see tagged issue we evaluation to flight necessary. inspection, wear is as analysis requiring post further a action Following potential if Eve's any additional
this aerospace in a our vehicles. we industry, of modifications schedule schedule. that we validate wide timing have For to used the upgrades everyone each for backgrounds, of inspections posts are and And like the of plan these
later next schedule our confirmed on last cycle for prior track. flight, all planned Eve's to is this fall Our maintenance inspections was and
planned. as of need what However, it. this last the we to calendar maintenance week, item action determine are the now of fall instead end an this be inspection, our to at we that just study issue further needs determining we necessary identified on still take to whether following emerged may last steps address Because
While it this to flight to flight to time the flight going need before we schedule. may that a test And our schedule, I forward. take back test on moving I'll impact this program. to emphasize provide our the of nature is information we're Michael, want turn some you more