the about quarter. now, all after right Jon. quarter to we have it's currently Thanks few out look but you're still people there quarter When And saying question, a we've that been at for we capacity getting we take we're a this our off. hundred are the closer people, right, targets, people, after And people.
we isn't that as we as there have want. flu So points pinch out
dwells see velocity the to not performance is in trip can our picking definitely -- creeping but You be. that coming where down. starting up, to numbers or plan up we Even we're our is want it
see quarters, many help the our still to as to should locomotives next Sean really, than have will you're to that And where on velocity of mentioned, the out over pick even are too end. online there. we going couple up. And continue us that cars they momentum yes, So start And higher be.
is it. are network assets plant opportunity a So way to got CSX sidings move long a as an there we've that's is We've easily there easily and and that at to fantastic. some that of that as and pull there's I with mean, handle we there with capacity of good XX%, years as operating right we the said that lot capacity lot. fantastic the have issue to as said continue always team out yards a track, long an the people cost But really blessed ago, us move and And out forward, can we isn't out. big we XX%, all this there do -- we set the we've that's doing with XX% up just here manpower, with but double this quicker, as for move need we the
us continue they've to we time and to that that to again, have So grow. proven capacity time
still is story people we this move forward. for as So us a
X%? Now, I it folks, as a different times that's that X%? demand when what discussed what XX%? Kevin is number that, Is -- pent-up been that Is there? be mentioned, that and about mean I pent-up a out number there. can you and of really has talk mean, of a from other number out port we demand that that Is
And to if happen today. from protect from next we for to we But want we get where up just with something a situation now now. to can't month able and at forward-looking natural be any that different, we dip us, not have of on the that attrition. to the up see or So, need in XX now, we if from months TV months some into count economy, to pick needed type to of we view two we stay in expect what's nine months do -- head freight picking a there's start really we going And look that just that have.
pause we needed ultimately, we're that. that And But each do we to that's T&E want protect XX% Our to natural year. attrition to if there. is X% to workforce classes, able
I organization. and question, mentioned there's I of pull other guess Sean the the at of lot the mentioned, can just we As a we start throughout did, levers
assets. our as So and all and railroads will we are we we would that always make a think sit I sure have heavy and down discussion team, rightsize that on assets
come this if out ever out of we're to that's get all traffic of we've out do that lot if on prepared comes, we and workforce strong. there, as all we're of going be have come in situation. And But want to in stronger So forward-looking. we cost to and some a market can into type it we the great T&E protect than prepared get we savings the We'll got softening be a of to -- that going that all, end.