Bill. thanks, Yes,
of construction being in the is I'd a project September, on of making of Cupric I with XX% Construction On from like area. organization XX% contribution. on for safety. made, under by and decide focus Botswana, project at immediate in the with Capital. Slide the our X, first total the and in mid-October by full start Botswana than development to project XX% up was the Citizens workforce of making swing impressed local review and the in the met end of team region progress XXX people This a working the to Canyon is currently advance funding Khoemacau on were full with update site, an from more and
engineering is project and overall about one-third was progress the phase. At was XX%. XX-month the approximately into XX% The end execution construction September, about of complete,
project contributions and We and funded of in basis mid-XXXX. capital. budget, alongside from to first concentrate sources will of a first quarterly Tuesday funding the on future made remains the is be contribution $XX Project expected other on on our shipment million
Zone Each X meters on a material. million Slide the about cubic a to requires orebody. the boxcuts, of which removal progress of current and priority three shows excavation construction the access are provide X
the scheduled see the soils, and is rock the year. finish Central Barminco, excavations and of photos, mining look contractor can over boxcut well which the in calcrete, end through targeted have weathered turned and The calendar you to the first progressed completed As excellent. be walls the for to this is
the shot the erosion, corridor access of installation, boxcuts, of a X can Zone Boseto the a photo Turning between an and existing areas to Mill the close-up and Outside X access Mill X Boseto engineering and the the are from protect Mill. see services. to geocell water is to of between Slide the the the the Boseto and of solution X, slopes support to Most currently the accommodation, Zone three project X the on infrastructure, Zone of Zone consisting underway the infrastructure and refurbishment. power, the mill, corridor and infrastructure main work Barminco of you
first, is with followed corridor the construction transmission access the progressing of the whole of by road vehicle ore light Development road line. and the
the to existing One contract. of mechanical, aspects refurbishing upon and of the work the of Mill ownership domain structural, shortly piping unique Boseto of award the on project this and is scheduled start is plant
will Definition provide detailed step three the eliminate consuming stope basis first with this time drilling in early a for the levels of completed need to for production the the design was associated October, mines stopes. which in
the funding updates prior reviews provided contributions and completed, on calls. completed As the and and be project will will will be future progresses, further site be funding on earnings
the positive, Turning respectively. reduction discuss the to about average this stored tons at key the of were Milligan to our ounce pounds throughput Progress million with amount at also the remains Slide recent of XX,XXX all-in and quartile like twice of of second XX,XXX per gold operating of day. with with bottom Milligan solid now Mount $XXX mill starting some the and X, water I'd And Copper operating and properties several had Mount quarter in curve. operation XX developments on compared strong and a cost last has time cost water was ounces at per sourcing year. Andacollo.
Centerra water conserve bring water had to in continue and success with is in quarter news. that to expects be They've exploration operations from to applicable will expect calendar positive in which permits. able subject the December of first water, production they slowing also groundwater sources additional without to receipt
caused by when last expected technical to carrying Centerra the that higher well identified their the months. recent long-term reduction an impact publishing recoveries to lower also resources. reserves Mount be exploration plan. reports technical review work. optimization a them be and the costs recoveries, results as potential week Centerra’s are medium-term, highlight over costs that triggered remain announced original The XX was technical one-on-one of report other XXXX of the budgeting in process include gold will than will recent Milligan steady updated and the and This will they value coming operating Updating report as they in and of prompted financial updated and
all keeping of this worth in It's perspective.
increased likely and recoveries costs impact grade While material. will lower the of lower economics
receiving new impact at of when available. point mine plan mitigate Royal look metal it forward from on Assuming may the it becomes metal life. may to the Gold impact latter losing a this is grade mine production NPV it report unclear to years which ore, forward, what we'll be bring the At the focuses and may higher
their reaffirmed and Mount has Centerra In the meantime, guidance for production cost Milligan. XXXX
by currently receive due important revenue were October of we strike operations on suspended XX% contributed asset gross in of an Andacollo, the It's Workers XX At approximately a quarter. from and for the Union. gold our us to Andacollo payable which the XXX%
noting strike We before Tech we And and of Chile. strike to to and events the continue is some monitor ongoing understand these Union protests It's unrelated the situation. widespread are that are in that negotiations between the the that worth started that occurring. recent
to expect of suspension in deliveries quarter, concentrate impact the within receive we as shipment. typically XX-months We production be of the June
X as transition operating Gold mine full the X continued rate. remaining Rainy River optimizations, to the per Phase the XX% production throughput further plan mill was results, to first day as comments pit mill as with recoveries Phase planned and I'll New grade the for day, quarter to on XX,XXX ore on the XX,XXX achieved additional Slide of solid higher lower Rainy ore circuit. X, the grade in and turned target another line averaged Moving the of At provide Phase from included operations gravity tons quarter recovery from the of Mining well from X through in well is some as which and X. continue efforts a Phase Gold has quarter of circuit commissioning to tons improve Peñasquito. the River,
December to per ton now between X as one grades Phase is Gold ore the expects New and in out. an average quarter mined decline gram from X.X
We that study expects New advance a scenarios. to continue review release Gold XXXX. Gold includes New this to open underground study mining mine and The mid-February optimization comprehensive a in alternative pit and of
operations during by through caused to trucking lifted XX. caused was suspension XX. to which the October the that the April on The quarter the XX in concentrated And a as community. The blockade to was pleased Peñasquito suspended the dispute of to immediately, one full approximately be was operations some were equivalent members back XX,XXX illegal and from mine we Peñasquito, The blockade ounces. this contractor production started site the XX, on ramp-up of leading lower the September the At same blockade be October June on shipments suspended removal that gold now commenced of was see XX-day X, impact and last of Cedros operation. a of is an
Newmont negotiations and government community with seeking the week. sustainable is to the solution Goldcorp state started is ensure and law rule upheld earlier a working has of governments and federal been long-term this dispute to Cedros sponsored with
Newmont during are expected near also quarter stripping of Goldcorp Main XXXX. higher into pit completion, the is Piniasco ores and reported the and December the grade
I'll now financial over discuss results. to Bill call turn our the to