ORGANIZATION AND DESCRIPTION OF BUSINESS | 1. ORGANIZATION AND DESCRIPTION OF BUSINESS China Recycling Energy Corporation (the “Company” or “CREG”) is incorporated in Nevada state. The Company, through its subsidiaries, provides energy saving solutions and services, including selling and leasing energy saving systems and equipment to customers, and project investment in the Peoples Republic of China (“PRC”). The Company’s organizational chart as of September 30, 2021 is as follows: Erdos TCH – Joint Venture On April 14, 2009, the Company formed a joint venture (the “JV”) with Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam to be sold back to Erdos. The name of the JV was Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd. (“Erdos TCH”) with a term of 20 years. Erdos contributed 7% of the total investment of the project, and Xi’an TCH Energy Technology Co., Ltd. (“Xi’an TCH”) contributed 93%. On June 15, 2013, Xi’an TCH and Erdos entered into a share transfer agreement, pursuant to which Erdos sold its 7% ownership interest in the JV to Xi’an TCH for $1.29 million (RMB 8 million), plus certain accumulated profits. Xi’an TCH paid the $1.29 million in July 2013 and, as a result, became the sole stockholder of the JV. Erdos TCH currently has two power generation systems in Phase I with a total of 18 MW power capacity, and three power generation systems in Phase II with a total of 27 MW power capacity. On April 28, 2016, Erdos TCH and Erdos entered into a supplemental agreement, effective May 1, 2016, whereby Erdos TCH cancelled monthly minimum lease payments from Erdos, and started to charge Erdos based on actual electricity sold at RMB 0.30 / KWH. The selling price of each KWH is determined annually based on prevailing market conditions. Since May 2019, Erdos TCH has ceased its operations due to renovations and furnace safety upgrades of Erdos, and the Company initially expected the resumption of operations in July 2020, but the resumption of operations was further delayed due to government’s mandate for Erdos to significantly lower its energy consumption per unit of GDP. Erdos and the municipal government are currently under discussion for seeking the solution of achieving the energy saving target. During this period, Erdos will compensate Erdos TCH RMB 1 million ($145,460) per month, until operations resume. The Company has not recognized any income due to the uncertainty of collection. In addition, Erdos TCH has 30% ownership in DaTangShiDai (BinZhou) Energy Savings Technology Co., Ltd. (“BinZhou Energy Savings”), 30% ownership in DaTangShiDai DaTong Recycling Energy Technology Co., Ltd. (“DaTong Recycling Energy”), and 40% ownership in DaTang ShiDai TianYu XuZhou Recycling Energy Technology Co, Ltd. (“TianYu XuZhou Recycling Energy”). These companies were incorporated in 2012 but there have not been any operations since then nor has any registered capital contribution been made. Shenqiu Yuneng Biomass Power Generation Projects On September 28, 2011, Xi’an TCH and Shenqiu entered into a BMPG Project Lease Agreement (the “2011 Shenqiu Lease”). Under the 2011 Shenqiu Lease, Xi’an TCH agreed to lease a set of 12 MW BMPG systems to Shenqiu at a monthly rental of $286,000 (RMB 1,800,000) for 11 years. On March 30, 2013, Xi’an TCH and Shenqiu entered into a BMPG Project Lease Agreement (the “2013 Shenqiu Lease”). Under the 2013 Shenqiu Lease, Xi’an TCH agreed to lease the second set of 12 MW BMPG systems to Shenqiu for $239,000 (RMB 1.5 million) per month for 9.5 years. As repayment for a loan made by Xi’an Zhonghong to Beijing Hongyuan Recycling Energy Investment Center, LLP (the “HYREF”) on January 10, 2019 (see further discussion in Note 8); on January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai (or “Mr. Bai”), a resident of China, entered into a Projects Transfer Agreement (the “Agreement”), pursuant to which Xi’an TCH transferred two BMGP in Shenqiu (“Shenqiu Phase I and II Projects”) to Mr. Bai for RMB 127,066,000 ($18.55 million). As consideration for the transfer of the Shenqiu Phase I and II Projects to Mr. Bai (Note 8), Mr. Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng Enterprises Management Consulting Co. Ltd. (“Xi’an Hanneng”) to Beijing Hongyuan Recycling Energy Investment Center, LLP (the “HYREF”) as repayment for a loan made by Xi’an Zhonghong to HYREF on January 10, 2019. The transfer of the projects was completed on February 15, 2019. The Company recorded $208,359 loss from the transfer during the year ended December 31, 2019. Xi’an Hanneng was expected to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd for the repayment of Shenqiu system and Huayu system. However, Xi’an Hanneng was not able to obtain all the Huaxin shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report. On December 20, 2019, Mr. Bai and all the related parties therefore agreed to have Mr. Bai instead make a payment in cash for the transfer price of Shenqiu (see Note 8 for detail). Chengli Waste Heat Power Generation Projects On July 19, 2013, Xi’an TCH formed a new company, “Xi’an Zhonghong New Energy Technology Co., Ltd.” (“Zhonghong”), of which it owns 90% of Zhonghong, with HYREF owning the other 10%. Zhonghong is engaged to provide energy saving solution and services, including constructing, selling and leasing energy saving systems and equipment to customers. On December 29, 2018, Shanghai TCH entered into a Share Transfer Agreement with HYREF, pursuant to which HYREF transferred its 10% ownership in Zhonghong to Shanghai TCH for RMB 3 million ($0.44 million). The transfer was completed on January 22, 2019. The Company owns 100% of Xi’an Zhonghong after the transaction. On July 24, 2013, Zhonghong entered into a Cooperative Agreement of CDQ and CDQ WHPG Project (Coke Dry Quenching Waste Heat Power Generation Project) with Boxing County Chengli Gas Supply Co., Ltd. (“Chengli”). The parties entered into a supplement agreement on July 26, 2013. Pursuant to these agreements, Zhonghong will design, build and maintain a 25 MW CDQ system and a CDQ WHPG system to supply power to Chengli, and Chengli will pay energy saving fees (the “Chengli Project”). On December 29, 2018, Xi’an Zhonghong, Xi’an TCH, HYREF, Guohua Ku, and Mr. Chonggong Bai entered into a CDQ WHPG Station Fixed Assets Transfer Agreement, pursuant to which Xi’an Zhonghong transferred Chengli CDQ WHPG station (‘the Station”) as the repayment for the loan of RMB 188,639,400 ($27.54 million) to HYREF. Xi’an Zhonghong, Xi’an TCH, Guohua Ku and Chonggong Bai also agreed to a Buy Back Agreement for the Station when certain conditions are met (see Note 8). The transfer of the Station was completed on January 22, 2019, at which time the Company recorded a $624,133 loss from this transfer. However, because the loan was not deemed repaid due to the buyback provision (See Note 8 for detail), the Company kept the loan and the Chengli project recognized in its consolidated financial statements (“CFS”) until April 9, 2021. The Buy Back Agreement was terminated on April 9, 2021, HYREF did not execute the buy-back option and did not ask for any additional payment from the buyers other than keeping the CDQ WHPG station. Tianyu Waste Heat Power Generation Project On July 19, 2013, Zhonghong entered into a Cooperative Agreement (the “Tianyu Agreement”) for Energy Management of CDQ and CDQ WHPG Projects with Jiangsu Tianyu Energy and Chemical Group Co., Ltd. (“Tianyu”). Pursuant to the Tianyu Agreement, Zhonghong will design, build, operate and maintain two sets of 25 MW CDQ systems and CDQ WHPG systems for two subsidiaries of Tianyu – Xuzhou Tian’an Chemical Co., Ltd. (“Xuzhou Tian’an”) and Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu”) – to be located at Xuzhou Tian’an and Xuzhou Huayu’s respective locations (the “Tianyu Project”). Upon completion of the Tianyu Project, Zhonghong will charge Tianyu an energy saving fee of RMB 0.534 ($0.087) per kilowatt hour (excluding tax). The term of the Tianyu Agreement is 20 years. The construction of the Xuzhou Tian’an Project is anticipated to be completed by the second quarter of 2020. The Xuzhou Huayu Project has been on hold due to a conflict between Xuzhou Huayu Coking Co., Ltd. and local residents on certain pollution-related issues. On January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai entered into a Projects Transfer Agreement (the “Agreement”), pursuant to which Xi’an Zhonghong transferred a CDQ WHPG station (under construction) located in Xuzhou City for Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu Project”) to Mr. Bai for RMB 120,000,000 ($17.52 million). Mr. Bai agreed that as consideration for the transfer of the Xuzhou Huayu Project to him, as well as Shenqiu discussed above, he would transfer all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the loan made by Xi’an Zhonghong to HYREF. (Note 8). The transfer of the project was completed on February 15, 2019. The Company recorded $397,033 loss from this transfer during the year ended December 31, 2019. On January 10, 2019, Mr. Chonggong Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the loan. Xi’an Hanneng was expected to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd for the repayment of Huayu system and Shenqiu system. As of September 30, 2019, Xi’an Hanneng already owned 29,948,000 shares of Huaxin, but was not able to obtain the remaining 17,202,000 shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report. On December 20, 2019, Mr. Bai and all the related parties agreed to have Mr. Bai instead making a payment in cash for the transfer price of Huayu (see Note 8 for detail). On January 10, 2020, Zhonghong, Tianyu and Huaxin signed a transfer agreement to transfer all assets under construction and related rights and interests of Xuzhou Tian’an Project to Tianyu for RMB 170 million including VAT ($24.37 million) in three installment payments. The 1st installment payment of RMB 50 million ($7.17 million) to be paid within 20 working days after the contract is signed. The 2nd installment payment of RMB 50 million ($7.34 million) is to be paid within 20 working days after completion of the project construction but no later than July 31, 2020. The final installment payment of RMB 70 million ($10.28 million) is to be paid before December 31, 2020. The Company received the payment in full for Tian’an Project as of December 31, 2020. Zhongtai Waste Heat Power Generation Energy Management Cooperative Agreement On December 6, 2013, Xi’an TCH entered into a CDQ and WHPG Energy Management Cooperative Agreement (the “Zhongtai Agreement”) with Xuzhou Zhongtai Energy Technology Co., Ltd. (“Zhongtai”), a limited liability company incorporated in Jiangsu Province, China. Pursuant to the Zhongtai Agreement, Xi’an TCH was to design, build and maintain a 150 ton per hour CDQ system and a 25 MW CDQ WHPG system and sell the power to Zhongtai, and Xi’an TCH is also to build a furnace to generate steam from the smoke pipeline’s waste heat and sell the steam to Zhongtai. In March 2016, Xi’an TCH entered into a Transfer Agreement of CDQ and a CDQ WHPG system with Zhongtai and Xi’an Huaxin (the “Transfer Agreement”). Under the Transfer Agreement, Xi’an TCH agreed to transfer to Zhongtai all of the assets associated with the CDQ Waste Heat Power Generation Project (the “Project”), which is under construction pursuant to the Zhongtai Agreement. Additionally, Xi’an TCH agreed to transfer to Zhongtai the Engineering, Procurement and Construction (“EPC”) Contract for the CDQ Waste Heat Power Generation Project which Xi’an TCH had entered into with Xi’an Huaxin in connection with the Project. Xi’an Huaxin will continue to construct and complete the Project and Xi’an TCH agreed to transfer all its rights and obligations under the EPC Contract to Zhongtai. As consideration for the transfer of the Project, Zhongtai agreed to pay to Xi’an TCH RMB 167,360,000 ($25.77 million) including (i) RMB 152,360,000 ($23.46 million) for the construction of the Project; and (ii) RMB 15,000,000 ($2.31 million) as payment for partial loan interest accrued during the construction period. Those amounts have been, or will be, paid by Zhongtai to Xi’an TCH according to the following schedule: (a) RMB 50,000,000 ($7.70 million) was to be paid within 20 business days after the Transfer Agreement was signed; (b) RMB 30,000,000 ($4.32 million) was to be paid within 20 business days after the Project was completed, but no later than July 30, 2016; and (c) RMB 87,360,000 ($13.45 million) was to be paid no later than July 30, 2017. Xuzhou Taifa Special Steel Technology Co., Ltd. (“Xuzhou Taifa”) guaranteed the payments from Zhongtai to Xi’an TCH. The ownership of the Project was conditionally transferred to Zhongtai following the initial payment of RMB 50,000,000 ($7.70 million) by Zhongtai to Xi’an TCH and the full ownership of the Project will be officially transferred to Zhongtai after it completes all payments pursuant to the Transfer Agreement. In 2016, Xi’an TCH had received the first payment of $7.70 million and the second payment of $4.32 million. However, the Company received a repayment commitment letter from Zhongtai on February 23, 2018, in which Zhongtai committed to pay the remaining payment of RMB 87,360,000 ($13.45 million) no later than the end of July 2018; in July 2018, Zhongtai and the Company reached a further oral agreement to extend the repayment term of RMB 87,360,000 ($13.45 million) by another two to three months. In January 2020, Zhongtai paid RMB 10 million ($1.41 million); in March 2020, Zhongtai paid RMB 20 million ($2.82 million); in June 2020, Zhongtai paid RMB 10 million ($1.41 million); and in December 2020, Zhongtai paid RMB 30 million ($4.28 million), which was payment in full. Accordingly, the Company reversed the bad debt expense of $5.80 million in 2020 which had been recorded earlier. Formation of Zhongxun On March 24, 2014, Xi’an TCH incorporated a subsidiary, Zhongxun Energy Investment (Beijing) Co., Ltd. (“Zhongxun”) with registered capital of $5,695,502 (RMB 35,000,000), which must be contributed before October 1, 2028. Zhongxun is 100% owned by Xi’an TCH and will be mainly engaged in project investment, investment management, economic information consulting, and technical services. Zhongxun has not yet commenced operations nor has any capital contribution been made as of the date of this report. Formation of Yinghua On February 11, 2015, the Company incorporated a subsidiary, Shanghai Yinghua Financial Leasing Co., Ltd. (“Yinghua”) with registered capital of $30,000,000, to be paid within 10 years from the date the business license is issued. Yinghua is 100% owned by the Company and will be mainly engaged in financial leasing, purchase of financial leasing assets, disposal and repair of financial leasing assets, consulting and ensuring of financial leasing transactions, and related factoring business. Yinghua has not yet commenced operations nor has any capital contribution been made as of the date of this report. Reverse Stock Split On April 13, 2020, the Company filed a certificate of change (“Certificate of Change”) with the Secretary of State of the State of Nevada, pursuant to which, on April 13, 2020, the Company effected a reverse stock split of its Common Stock, at a rate of 1-for-10, accompanied by a corresponding decrease in the Company’s issued and outstanding shares of Common Stock (the “Reverse Stock Split”). The accompanying consolidated financial statements and related disclosure in for periods prior to the Reverse Stock Split have been retroactively restated to reflect this reverse stock split. Other Events In December 2019, a novel strain of coronavirus (COVID-19) was reported and the World Health Organization has declared the outbreak to constitute a “Public Health Emergency of International Concern.” This pandemic, which continues to spread to additional countries, and is disrupting supply chains and affecting production and sales across a range of industries as a result of quarantines, facility closures, and travel and logistics restrictions in connection with the outbreak. However, as a result of PRC government’s effort on disease control, most cities in China were reopened, the outbreak in China is under the control. As of this report date, there are some new Covid-19 cases discovered in a few provinces of China, however, the number of new cases is not significant due to PRC government’s strict control. On July 27, 2021, the Company filed a certificate of change to the Company’s Articles of Incorporation with the Secretary of State of the State of Nevada to increase the total number of the Company’s authorized shares of common stock from 10,000,000 shares to 100,000,000 shares, par value $0.001 per share. | 1. ORGANIZATION AND DESCRIPTION OF BUSINESS China Recycling Energy Corporation (the “Company” or “CREG”) is incorporated in Nevada state. The Company, through its subsidiaries, provides energy saving solutions and services, including selling and leasing energy saving systems and equipment to customers, and project investment in the Peoples Republic of China (“PRC”). The Company’s organizational chart as of December 31, 2020 is as follows: Erdos TCH – Joint Venture On April 14, 2009, the Company formed a joint venture (the “JV”) with Erdos Metallurgy Co., Ltd. (“Erdos”) to recycle waste heat from Erdos’ metal refining plants to generate power and steam to be sold back to Erdos. The name of the JV was Inner Mongolia Erdos TCH Energy Saving Development Co., Ltd. (“Erdos TCH”) with a term of 20 years. Erdos contributed 7% of the total investment of the project, and Xi’an TCH Energy Technology Co., Ltd. (“Xi’an TCH”) contributed 93%. On June 15, 2013, Xi’an TCH and Erdos entered into a share transfer agreement, pursuant to which Erdos sold its 6.6% ownership interest in the JV to Xi’an TCH for $1.29 million (RMB 8 million), plus certain accumulated profits as described below. Xi’an TCH paid the $1.29 million in July 2013 and, as a result, became the sole stockholder of the JV. Erdos TCH currently has two power generation systems in Phase I with a total of 18 MW power capacity, and three power generation systems in Phase II with a total of 27 MW power capacity. On April 28, 2016, Erdos TCH and Erdos entered into a supplemental agreement, effective May 1, 2016, whereby Erdos TCH cancelled monthly minimum lease payments from Erdos, and started to charge Erdos based on actual electricity sold at RMB 0.30 / KWH. The selling price of each KWH is determined annually based on prevailing market conditions. Since May 2019, Erdos TCH has ceased its operations due to renovations and furnace safety upgrades of Erdos, and the Company initially expected the resumption of operations in July 2020, but the resumption of operations was further delayed due to government’s request for Erdos’ production line rectification for lowering its energy consumption per unit of GDP, the Company expects to resume the production in July 2021. During this period, Erdos will compensate Erdos TCH RMB 1 million ($145,460) per month, until operations resume. In addition, Erdos TCH has 30% ownership in DaTangShiDai (BinZhou) Energy Savings Technology Co., Ltd. (“BinZhou Energy Savings”), 30% ownership in DaTangShiDai DaTong Recycling Energy Technology Co., Ltd. (“DaTong Recycling Energy”), and 40% ownership in DaTang ShiDai TianYu XuZhou Recycling Energy Technology Co, Ltd. (“TianYu XuZhou Recycling Energy”). These companies were incorporated in 2012 but there have not been any operations since then nor has any registered capital contribution been made. Pucheng Biomass Power Generation Projects On June 29, 2010, Xi’an TCH entered into a Biomass Power Generation (“BMPG”) Project Lease Agreement with Pucheng XinHengYuan Biomass Power Generation Co., Ltd. (“Pucheng”), a limited liability company incorporated in China. Under this lease agreement, Xi’an TCH leased a set of 12 MW BMPG systems to Pucheng at a minimum of $279,400 (RMB 1,900,000) per month for 15 years (“Pucheng Phase I”). On September 11, 2013, Xi’an TCH entered into a BMPG Asset Transfer Agreement (the “Pucheng Transfer Agreement”) with Pucheng. The Pucheng Transfer Agreement provided for the sale by Pucheng to Xi’an TCH of a set of 12 MW BMPG systems with completion of system transformation for RMB 100 million ($16.48 million) in the form of 87,666 shares (post-reverse stock split) of common stock, par value $0.001 per share (the “Common Stock”) of the Company at $187.0 per share (post-reverse stock price). Also on September 5, 2013, Xi’an TCH entered into a BMPG Project Lease Agreement with Pucheng (the “Pucheng Lease”). Under the Pucheng Lease, Xi’an TCH leases this same set of 12 MW BMPG systems to Pucheng, and combined this lease with the lease for the 12 MW BMPG station of Pucheng Phase I project, under a single lease to Pucheng for RMB 3.8 million ($0.63 million) per month (the “Pucheng Phase II Project”). The term for the combined lease is from September 2013 to June 2025. The lease agreement for the 12 MW station from the Pucheng Phase I project terminated upon the effective date of the Pucheng Lease. The ownership of the two 12 MW BMPG systems will transfer to Pucheng at no additional charge when the Pucheng Lease expires. On September 29, 2019, Xi’an TCH entered into a Termination Agreement of the Lease Agreement of the Biomass Power Generation Project (the “Termination Agreement”) with Pucheng. Pursuant to the Termination Agreement, the parties agreed that: (i) Pucheng shall pay outstanding lease fees of RMB 97.6 million ($14 million) owed as of December 31, 2018 to Xi’an TCH before January 15, 2020; (ii) Xi’an TCH will waive the lease fees owed after January 1, 2019; (iii) Xi’an TCH will not return RMB 3.8 million ($542,857) in cash deposits paid by Pucheng; (iv) Xi’an TCH will transfer the Project to Pucheng at no additional cost after receiving RMB 97.6 million ($14 million) from Pucheng, and the original lease agreement between the parties will be formally terminated; and (v) if Pucheng fails to pay off RMB 97.6 million ($14 million) to Xi’an TCH before January 15, 2020, Xi’an TCH will still hold ownership of the Project and the original lease agreement shall still be valid. The Company recorded $2.67 million bad debt expense for Pucheng during the year ended December 31, 2019. Xi’an TCH received RMB 97.6 million ($14 million) in full on January 14, 2020 and the ownership of the system was transferred. Shenqiu Yuneng Biomass Power Generation Projects On September 28, 2011, Xi’an TCH and Shenqiu entered into a BMPG Project Lease Agreement (the “2011 Shenqiu Lease”). Under the 2011 Shenqiu Lease, Xi’an TCH agreed to lease a set of 12 MW BMPG systems to Shenqiu at a monthly rental of $286,000 (RMB 1,800,000) for 11 years. On March 30, 2013, Xi’an TCH and Shenqiu entered into a BMPG Project Lease Agreement (the “2013 Shenqiu Lease”). Under the 2013 Shenqiu Lease, Xi’an TCH agreed to lease the second set of 12 MW BMPG systems to Shenqiu for $239,000 (RMB 1.5 million) per month for 9.5 years. As repayment for a loan made by Xi’an Zhonghong to Beijing Hongyuan Recycling Energy Investment Center, LLP (the “HYREF”) on January 10, 2019 (see further discussion in Note 9); on January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai (or “Mr. Bai”), a resident of China, entered into a Projects Transfer Agreement (the “Agreement”), pursuant to which Xi’an TCH transferred two BMGP in Shenqiu (“Shenqiu Phase I and II Projects”) to Mr. Bai for RMB 127,066,000 ($18.55 million). As consideration for the transfer of the Shenqiu Phase I and II Projects to Mr. Bai (Note 9), Mr. Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng Enterprises Management Consulting Co. Ltd. (“Xi’an Hanneng”) to Beijing Hongyuan Recycling Energy Investment Center, LLP (the “HYREF”) as repayment for a loan made by Xi’an Zhonghong to HYREF on January 10, 2019. The transfer of the projects was completed on February 15, 2019. The Company recorded $208,359 loss from the transfer during the year ended December 31, 2019. Xi’an Hanneng was expected to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd for the repayment of Shenqiu system and Huayu system. However, Xi’an Hanneng was not able to obtain all the Huaxin shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report. On December 20, 2019, Mr. Bai and all the related parties therefore agreed to have Mr. Bai instead make a payment in cash for the transfer price of Shenqiu (see Note 9 for detail). Chengli Waste Heat Power Generation Projects On July 19, 2013, Xi’an TCH formed a new company, “Xi’an Zhonghong New Energy Technology Co., Ltd.” (“Zhonghong”), of which it owns 90% of Zhonghong, with HYREF owning the other 10%. Zhonghong is engaged to provide energy saving solution and services, including constructing, selling and leasing energy saving systems and equipment to customers. On December 29, 2018, Shanghai TCH entered into a Share Transfer Agreement with HYREF, pursuant to which HYREF transferred its 10% ownership in Zhonghong to Shanghai TCH for RMB 3 million ($0.44 million). The transfer was completed on January 22, 2019. The Company owns 100% of Xi’an Zhonghong after the transaction. On July 24, 2013, Zhonghong entered into a Cooperative Agreement of CDQ and CDQ WHPG Project (Coke Dry Quenching Waste Heat Power Generation Project) with Boxing County Chengli Gas Supply Co., Ltd. (“Chengli”). The parties entered into a supplement agreement on July 26, 2013. Pursuant to these agreements, Zhonghong will design, build and maintain a 25 MW CDQ system and a CDQ WHPG system to supply power to Chengli, and Chengli will pay energy saving fees (the “Chengli Project”). On December 29, 2018, Xi’an Zhonghong, Xi’an TCH, HYREF, Guohua Ku, and Mr. Chonggong Bai entered into a CDQ WHPG Station Fixed Assets Transfer Agreement, pursuant to which Xi’an Zhonghong transferred Chengli CDQ WHPG station (“the Station”) as the repayment for the loan of RMB 188,639,400 ($27.54 million) to HYREF. Xi’an Zhonghong, Xi’an TCH, Guohua Ku and Chonggong Bai also agreed to a Buy Back Agreement for the Station when certain conditions are met (see Note 9). The transfer of the Station was completed January 22, 2019, at which time the Company recorded a $624,133 loss from this transfer. Since the original terms of the Buy Back Agreement are still valid, and the Buy Back possibility could occur; therefore, the loan principal and interest and the corresponding asset of the Station cannot be derecognized due to the existence of Buy Back clauses (see Note 9 for detail). Tianyu Waste Heat Power Generation Project On July 19, 2013, Zhonghong entered into a Cooperative Agreement (the “Tianyu Agreement”) for Energy Management of CDQ and CDQ WHPG Projects with Jiangsu Tianyu Energy and Chemical Group Co., Ltd. (“Tianyu”). Pursuant to the Tianyu Agreement, Zhonghong will design, build, operate and maintain two sets of 25 MW CDQ systems and CDQ WHPG systems for two subsidiaries of Tianyu – Xuzhou Tian’an Chemical Co., Ltd. (“Xuzhou Tian’an”) and Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu”) – to be located at Xuzhou Tian’an and Xuzhou Huayu’s respective locations (the “Tianyu Project”). Upon completion of the Tianyu Project, Zhonghong will charge Tianyu an energy saving fee of RMB 0.534 ($0.087) per kilowatt hour (excluding tax). The term of the Tianyu Agreement is 20 years. The construction of the Xuzhou Tian’an Project is anticipated to be completed by the second quarter of 2020. The Xuzhou Huayu Project has been on hold due to a conflict between Xuzhou Huayu Coking Co., Ltd. and local residents on certain pollution-related issues. On January 4, 2019, Xi’an Zhonghong, Xi’an TCH, and Mr. Chonggong Bai entered into a Projects Transfer Agreement (the “Agreement”), pursuant to which Xi’an Zhonghong transferred a CDQ WHPG station (under construction) located in Xuzhou City for Xuzhou Huayu Coking Co., Ltd. (“Xuzhou Huayu Project”) to Mr. Bai for RMB 120,000,000 ($17.52 million). Mr. Bai agreed that as consideration for the transfer of the Xuzhou Huayu Project to him, as well as Shenqiu discussed above, he would transfer all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the loan made by Xi’an Zhonghong to HYREF. (Note 9). The transfer of the project was completed on February 15, 2019. The Company recorded $397,033 loss from this transfer during the year ended December 31, 2019. On January 10, 2019, Mr. Chonggong Bai transferred all the equity shares of his wholly owned company, Xi’an Hanneng, to HYREF as repayment for the loan. Xi’an Hanneng was expected to own 47,150,000 shares of Xi’an Huaxin New Energy Co., Ltd for the repayment of Huayu system and Shenqiu system. As of September 30, 2019, Xi’an Hanneng already owned 29,948,000 shares of Huaxin, but was not able to obtain the remaining 17,202,000 shares due to halted trading of Huaxin stock by NEEQ for not filing its 2018 annual report. On December 20, 2019, Mr. Bai and all the related parties agreed to have Mr. Bai instead making a payment in cash for the transfer price of Huayu (see Note 9 for detail). On January 10, 2020, Zhonghong, Tianyu and Huaxin signed a transfer agreement to transfer all assets under construction and related rights and interests of Xuzhou Tian’an Project to Tianyu for RMB 170 million including VAT ($24.37 million) in three installment payments. The 1st installment payment of RMB 50 million ($7.17 million) to be paid within 20 working days after the contract is signed. The 2nd installment payment of RMB 50 million ($7.34 million) is to be paid within 20 working days after completion of the project construction but no later than July 31, 2020. The final installment payment of RMB 70 million ($10.28 million) is to be paid before December 31, 2020. The Company received the payment in full for Tian’an Project as of December 31, 2020. Zhongtai Waste Heat Power Generation Energy Management Cooperative Agreement On December 6, 2013, Xi’an TCH entered into a CDQ and WHPG Energy Management Cooperative Agreement (the “Zhongtai Agreement”) with Xuzhou Zhongtai Energy Technology Co., Ltd. (“Zhongtai”), a limited liability company incorporated in Jiangsu Province, China. Pursuant to the Zhongtai Agreement, Xi’an TCH was to design, build and maintain a 150 ton per hour CDQ system and a 25 MW CDQ WHPG system and sell the power to Zhongtai, and Xi’an TCH is also to build a furnace to generate steam from the smoke pipeline’s waste heat and sell the steam to Zhongtai. In March 2016, Xi’an TCH entered into a Transfer Agreement of CDQ and a CDQ WHPG system with Zhongtai and Xi’an Huaxin (the “Transfer Agreement”). Under the Transfer Agreement, Xi’an TCH agreed to transfer to Zhongtai all of the assets associated with the CDQ Waste Heat Power Generation Project (the “Project”), which is under construction pursuant to the Zhongtai Agreement. Additionally, Xi’an TCH agreed to transfer to Zhongtai the Engineering, Procurement and Construction (“EPC”) Contract for the CDQ Waste Heat Power Generation Project which Xi’an TCH had entered into with Xi’an Huaxin in connection with the Project. Xi’an Huaxin will continue to construct and complete the Project and Xi’an TCH agreed to transfer all its rights and obligations under the EPC Contract to Zhongtai. As consideration for the transfer of the Project, Zhongtai agreed to pay to Xi’an TCH RMB 167,360,000 ($25.77 million) including (i) RMB 152,360,000 ($23.46 million) for the construction of the Project; and (ii) RMB 15,000,000 ($2.31 million) as payment for partial loan interest accrued during the construction period. Those amounts have been, or will be, paid by Zhongtai to Xi’an TCH according to the following schedule: (a) RMB 50,000,000 ($7.70 million) was to be paid within 20 business days after the Transfer Agreement was signed; (b) RMB 30,000,000 ($4.32 million) was to be paid within 20 business days after the Project was completed, but no later than July 30, 2016; and (c) RMB 87,360,000 ($13.45 million) was to be paid no later than July 30, 2017. Xuzhou Taifa Special Steel Technology Co., Ltd. (“Xuzhou Taifa”) guaranteed the payments from Zhongtai to Xi’an TCH. The ownership of the Project was conditionally transferred to Zhongtai following the initial payment of RMB 50,000,000 ($7.70 million) by Zhongtai to Xi’an TCH and the full ownership of the Project will be officially transferred to Zhongtai after it completes all payments pursuant to the Transfer Agreement. The Company recorded a $2.82 million loss from this transaction in 2016. In 2016, Xi’an TCH had received the first payment of $7.70 million and the second payment of $4.32 million. However, the Company received a repayment commitment letter from Zhongtai on February 23, 2018, in which Zhongtai committed to pay the remaining payment of RMB 87,360,000 ($13.45 million) no later than the end of July 2018; in July 2018, Zhongtai and the Company reached a further oral agreement to extend the repayment term of RMB 87,360,000 ($13.45 million) by another two to three months. In January 2020, Zhongtai paid RMB 10 million ($1.41 million); in March 2020, Zhongtai paid RMB 20 million ($2.82 million); in June 2020, Zhongtai paid RMB 10 million ($1.41 million); and in December 2020, Zhongtai paid RMB 30 million ($4.28 million), which was payment in full. Accordingly, the Company reversed the bad debt expense of $5.80 million which had been recorded earlier. Formation of Zhongxun On March 24, 2014, Xi’an TCH incorporated a subsidiary, Zhongxun Energy Investment (Beijing) Co., Ltd. (“Zhongxun”) with registered capital of $5,695,502 (RMB 35,000,000), which must be contributed before October 1, 2028. Zhongxun is 100% owned by Xi’an TCH and will be mainly engaged in project investment, investment management, economic information consulting, and technical services. Zhongxun has not yet commenced operations nor has any capital contribution been made as of the date of this report. Formation of Yinghua On February 11, 2015, the Company incorporated a subsidiary, Shanghai Yinghua Financial Leasing Co., Ltd. (“Yinghua”) with registered capital of $30,000,000, to be paid within 10 years from the date the business license is issued. Yinghua is 100% owned by the Company and will be mainly engaged in financial leasing, purchase of financial leasing assets, disposal and repair of financial leasing assets, consulting and ensuring of financial leasing transactions, and related factoring business. Yinghua has not yet commenced operations nor has any capital contribution been made as of the date of this report. Reverse Stock Split On April 13, 2020, the Company filed a certificate of change (“Certificate of Change”) with the Secretary of State of the State of Nevada, pursuant to which, on April 13, 2020, the Company effected a reverse stock split of its Common Stock, at a rate of 1-for-10, accompanied by a corresponding decrease in the Company’s issued and outstanding shares of Common Stock (the “Reverse Stock Split”). The accompanying consolidated financial statements and related disclosure in for periods prior to the Reverse Stock Split have been retroactively restated to reflect this reverse stock split. Other Events In December 2019, a novel strain of coronavirus (COVID-19) was reported in and the World Health Organization has declared the outbreak to constitute a “Public Health Emergency of International Concern.” This pandemic, which continues to spread to additional countries, and is disrupting supply chains and affecting production and sales across a range of industries as a result of quarantines, facility closures, and travel and logistics restrictions in connection with the outbreak. However, as a result of PRC government’s effort on disease control, most cities in China were reopened, the outbreak in China is under the control. The Company disposed all of its systems and currently holds only five power generating systems through Erdos TCH, the Company initially expected to resume production of these five power generating systems in July 2020 from the renovation and furnace safety upgrade, but the resumption of operations was further delayed due to government’s request for Erdos’ production line rectification for lowering its energy consumption per unit of GDP; the Company expects the resumption date to be July 2021. As of this report date, there are some new Covid-19 cases discovered in a few provinces of China, however, the number of new cases is not significant due to PRC government’s strict control. On December 22, 2020, Shanghai TCH entered into an Equity Acquisition Agreement with Xi’an Taiying Energy Saving Technology Co., Ltd., a PRC company (“Xi’an Taiying”) and its three shareholders to purchase all of the issued and outstanding shares of stock of Xi’an Taiying. The purchase price for said shares shall consist of (i) 619,525 shares of common stock at an issuance price of $4.37 per share, (ii) 60,000,000 shares of Series A convertible stock and (iii) a cash payment of RMB 1,617,867,026 (approximately $247 million at a conversion rate of 1:6.55). The shares shall be issued within 15 business days after approval by the Board of Directors and/or shareholders of the Company and Nasdaq approval and the cash shall be paid in three tranches – RMB 390 million (approximately $59.5 million) within 10 days after the agreement is executed, RMB 300 million (approximately $45.8 million) by March 31, 2021 and RMB 927,867,026 (approximately $141.7 million) within 10 days after the shares of Xi’an Taiying are registered to Buyer. As of the date of this report, the Company has not obtained and there is no assurance that the Company will be able to obtain necessary approval to proceed with the transaction. In addition, the Company is currently renegotiating the payment terms with the sellers for paying less shares but does not know when the renegotiation will be completed. |