Regulatory Matters | Regulatory Matters 2022 Retail Rate Case APS filed an application with the ACC on October 28, 2022 (the “2022 Rate Case”) seeking an increase in annual retail base rates on the date rates become effective (“Day 1”) of a net $460 million. This Day 1 net impact would have represented a total base revenue deficiency of $772 million, offset by proposed adjustor transfers of cost recovery to annual retail rates and adjustor mechanism modifications. The average annual customer bill impact of APS’s request on Day 1 would have been an increase of 13.6%. The principal provisions of APS’s application were: • a test year comprised of twelve months ended June 30, 2022, adjusted as described below; • an original cost rate base of $10.5 billion, which approximates the ACC-jurisdictional portion of the book value of utility assets, net of accumulated depreciation and other credits; • the following proposed capital structure and costs of capital: Capital Structure Cost of Capital Long-term debt 48.07 % 3.85 % Common stock equity 51.93 % 10.25 % Weighted-average cost of capital 7.17 % • a 1% return on the increment of fair value rate base above APS’s original cost rate base, as provided for by Arizona law; • a rate of $0.038321 per kWh for the portion of APS’s retail base rates attributable to fuel and purchased power costs (“Base Fuel Rate”); • modification of its adjustment mechanisms including: ▪ eliminate the Environmental Improvement Surcharge (“EIS”) and collect costs through base rates, ▪ eliminate the Lost Fixed Cost Recovery (“LFCR”) mechanism and collect costs through base rates and the Demand Side Management (“DSM”) Adjustment Charge (“DSMAC”), ▪ maintain as inactive the Tax Expense Adjustor Mechanism (“TEAM”), ▪ maintain the Transmission Cost Adjustment (“TCA”) mechanism, ▪ modify the performance incentive in the DSMAC, and ▪ modify the Renewable Energy Adjustment Charge (“REAC”) to include recovery of capital carrying costs of APS owned renewable and storage resources; • changes to its limited-income program, including a second tier to provide an additional discount for customers with greater need; and • twelve months of post-test year plant investments to reflect used and useful projects that will be placed into service prior to July 1, 2023. On June 5, 2023, and June 15, 2023, the ACC Staff, the Residential Utility Consumer Office (“RUCO”) and other intervenors filed their initial written testimony with the ACC. The ACC Staff recommended, among other things, (i) a $251 million revenue increase or, as an alternative, a $312 million revenue increase, (ii) a 9.6% return on equity, (iii) a 0.0% fair value increment or, as an alternative, a 0.75% fair value increment, and (iv) a continuation of a 12-month post-test year plant. RUCO recommended, among other things, (i) an $84.9 million revenue increase, (ii) an 8.2% return on equity or, as an alternative, an 8.7% return on equity if the ACC imputes a hypothetical capital structure with a 46% equity layer, (iii) a fair value increment of 0.0%, and (iv) a reduction of post-test year plant to six months. On July 12, 2023, APS filed rebuttal testimony addressing the ACC Staff and intervenors’ direct testimonies. The principal provisions of APS’s rebuttal testimony were: • reducing the revenue requirement increase to $383.1 million, which reduced the average annual customer bill impact to an increase of 11.3%; • maintaining a return on equity request of 10.25%; • reducing the increment of fair value rate base return to 0.5% from 1.0%; • maintaining a post-test year plant request of 12 months, plus the Four Corners Power Plant (“Four Corners”) Effluent Limitation Guidelines (“ELG”) project; • withdrawing the Payment Fee Removal Proposal (net reduction) which was originally requested in APS’s initial application; • maintaining the LFCR mechanism and DSMAC as separate adjustors; • increasing the Power Supply Adjustment (“PSA”) annual rate change limit from $0.004/kWh to $0.006/kWh; • proposing a new System Reliability Benefit (“SRB”) recovery mechanism; • maintaining the REAC in its current state; • maintaining adjustor base transfers and elimination of EIS; and • maintaining the request to recover Coal Community Transition (“CCT”) funding. On July 26, 2023, the ACC Staff, RUCO and other intervenors filed their surrebuttal testimony with the ACC. The ACC Staff adjusted their initial recommendations to, among other things, (i) a $281.9 million revenue increase, (ii) a 9.68% return on equity, (iii) a 0.5% fair value increment, (iv) a continuation of a 12-month post-test year plant that includes the Four Corners ELG project, and (v) support of an increase to the annual PSA increase limit to $0.006/kWh. RUCO maintained their direct position and also recommended further review of the PSA in a second phase of the 2022 Rate Case. On August 4, 2023, APS filed rejoinder testimony addressing the ACC Staff and intervenors’ surrebuttal testimonies. APS’s rejoinder testimony included final post-test year plant values, reducing the revenue requirement increase to $377.7 million from $383.1 million, which reduced the average annual customer bill impact to an increase of 11.2%. All other major provisions from APS’s rebuttal testimony were maintained in its rejoinder testimony. On November 6, 2023, and November 21, 2023, APS and stakeholders filed briefs in the 2022 Rate Case. APS’s briefs included the reduction of the total revenue requirement increase to $376.2 million and a resulting average annual customer bill impact increase of 11.1%. All other major provisions from APS’s rejoinder testimony were maintained in its briefs. ACC Staff’s briefs included a proposed total revenue requirement increase from $281.9 million to $282.7 million and also included their support of APS’s SRB mechanism, contingent on increased stakeholder outreach. On January 25, 2024, an Administrative Law Judge issued a Recommended Opinion and Order in the 2022 Rate Case, as corrected on February 6, 2024 (the “2022 Rate Case ROO”). The 2022 Rate Case ROO recommended, among other things, (i) a $523.1 million increase in the annual base rate revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.36%, (v) 12 months of post-test year plant and the inclusion of the Four Corners ELG project, (vi) the approval of APS’s SRB proposal with certain procedural and other modifications, (vii) no additional CCT funding, (viii) a 5.0% return on the prepaid pension asset and a return of 5.35% on the OPEB liability, and (ix) no disallowances on APS’s coal contracts. The 2022 Rate Case ROO also recommended a number of changes to existing adjustors, including (i) the approval of modified DSM performance incentives and the requested DSM transfer to base rates, (ii) the retention of $1.9 million of REAC in the adjustor rather than base rates, (iii) a partial transfer of $27.1 million of LFCR funds to base rates, and (iv) the adoption of an increase in the annual PSA cap to $0.006/kWh. On February 22, 2024, the ACC approved a number of amendments to the 2022 Rate Case ROO that resulted in, among other things, (i) an approximately $491.7 million increase in the annual base revenue requirement, (ii) a 9.55% return on equity, (iii) a 0.25% return on the increment of fair value rate base greater than original cost, (iv) an effective fair value rate of return of 4.39%, (v) a return set at the Company’s weighted average cost of capital on the net prepaid pension asset and net other post-employment benefit liability in rate base, (vi) an adjustment to generation maintenance and outage expense to reflect a more reasonable level of test year costs, (vii) approval of the SRB mechanism with modifications to customer notifications, procedural timelines and the inclusion of any qualifying technology and fuel source bid received through an all-source request for proposal (“ASRFP”), and (viii) recovery of all DSM costs through the DSMAC rather than through base rates. The ACC’s decision results in an expected total net annual revenue increase for APS of approximately $253.4 million and a roughly 8% increase to the typical residential customer’s bill. The ACC issued the final order for the 2022 Rate Case on March 5, 2024, with the new rates becoming effective for all service rendered on or after March 8, 2024. Six intervenors and the Attorney General of Arizona requested rehearing on various issues included in the ACC’s decision, such as the grid access charge (“GAC”) for solar customers, the SRB, and CCT funding. On April 15, 2024, the ACC granted, in part, the rehearing applications of the Attorney General, Arizona Solar Energy Industries Association, Solar Energy Industries Association, and Vote Solar for the limited purpose of reviewing arguments concerning the GAC. Specifically, rehearing was ordered as to whether the GAC rate is just and reasonable, including whether it should be higher or lower, whether the GAC rate constitutes a discriminatory fee to solar customers, and whether omission of a GAC charge is discriminatory to non-solar customers. All other applications for rehearing were denied. The parties seeking rehearing had 30 days after the denial or granting of a request for rehearing to file a notice of appeal to the Arizona Court of Appeals. No party filed a notice of appeal within the 30-day period. A limited rehearing was scheduled for the purpose of reviewing the GAC. Written testimony from APS and intervenors for the limited rehearing was filed on September 24, 2024, and rebuttal testimony from parties was filed on October 18, 2024. The limited rehearing began on October 28, 2024. APS cannot predict the outcome of these proceedings. 2019 Retail Rate Case On October 31, 2019, APS filed an application with the ACC for an annual increase in retail base rates (the “2019 Rate Case”). On August 2, 2021, an Administrative Law Judge issued a Recommended Opinion and Order in the 2019 Rate Case (the “2019 Rate Case ROO”) and issued corrections on September 10 and September 20, 2021. On November 2, 2021, the ACC approved the 2019 Rate Case ROO, with various amendments, that resulted in, among other things, (i) a return on equity of 8.70%, which included a 20-basis point penalty; (ii) the recovery of the deferral and rate base effects of the operating costs and construction of the Four Corners selective catalytic reduction (“SCR”) project, with the exception of $215.5 million (see “Four Corners SCR Cost Recovery” below); (iii) the CCT plan including the following components: (a) a payment of $1 million to the Hopi Tribe within 60 days of the 2019 Rate Case decision, (b) a payment of $10 million over three years to the Navajo Nation, (c) a payment of $0.5 million to the Navajo County communities within 60 days of the 2019 Rate Case decision, (d) up to $1.25 million for electrification of homes and businesses on the Hopi reservation, and (e) up to $1.25 million for the electrification of homes and businesses on the Navajo Nation reservation; and (iv) a change in the residential on-peak time-of-use period from 3 p.m. to 8 p.m. to 4 p.m. to 7 p.m. Monday through Friday, excluding holidays. The 2019 Rate Case ROO, as amended, resulted in a total annual revenue decrease for APS of $4.8 million, excluding temporary payments and expenditures under the CCT plan. Consistent with the 2019 Rate Case decision, APS completed the following payments that are being recovered t hrough rates related to the CCT: (i) $10 million to the Navajo Nation; (ii) $0.5 million to the Navajo County communities; and (iii) $1 million to the Hopi Tribe. Consistent with APS’s commitment to the impacted communities, APS has also completed the following payments: (i) $1.5 million to the Navajo Nation for CCT; (ii) $1.1 million to the Navajo County communities for CCT and economic development; and (iii) $1.25 million to the Hopi Tribe for CCT and economic development. The ACC also authorized $1.25 million to be spent for electrification of homes and businesses on each of the Navajo Nation and Hopi reservations. Expenditure of the recoverable funds for electrification of homes and businesses on the Navajo Nation and the Hopi reservations is contingent upon completion of a census of the unelectrified homes and businesses in each that are also within APS service territory. The census work was completed in November 2022 and disbursement of the funds for electrification of homes and businesses is planned to be finalized after discussions with the Navajo Nation and the Hopi Tribe are completed. On February 22, 2024, the ACC voted to not approve any further CCT funding. APS filed a Notice of Direct Appeal to the Arizona Court of Appeals on December 17, 2021 requesting review of certain aspects of the 2019 Rate Case. On March 6, 2023, the Court issued its opinion in this matter, affirming in part and reversing in part the ACC’s decision in the 2019 Rate Case. The Court vacated the 20-basis-point penalty included in the ACC’s allowed return on equity, as the Court determined the use of customer service metrics to justify the reduction exceeded the ACC’s ratemaking authority. Additionally, the Court vacated the disallowance of $215.5 million of APS’s Four Corners SCR investment. The Court remanded the issue to the ACC for further proceedings. On June 14, 2023, APS and the ACC Legal Division filed a joint resolution with the ACC to allow recovery of the $215.5 million in costs related to the installation of the Four Corners SCR, a reversal of the 20-basis point reduction to APS’s return on equity from 8.9% to 8.7% as a result of the 2019 Rate Case decision, and recovery of $59.6 million in revenue lost by APS between December 2021 and June 20, 2023. On June 21, 2023, the ACC approved the joint resolution and proposals therein for recovery through the Court Resolution Surcharge (“CRS”) mechanism, which became effective on July 1, 2023. See “Court Resolution Surcharge” below for more information. Regulatory Lag Docket On January 5, 2023, the ACC opened a new docket to explore the possibility of modifications to the ACC’s historical test year rules. The ACC requested comments from utilities and interested parties on ways to reduce regulatory lag, including alternative ratemaking structures such as future test years and hybrid test years. APS filed comments on June 1, 2023. On March 19, 2024, the ACC held a workshop to discuss modifying the state’s rate case test year rules. Utilities, including APS, spoke about alternatives to the current rules that could reduce regulatory lag. On April 19, 2024, a letter was filed to the docket by an ACC commissioner discussing the potential benefits of modifying test year rules, including the potentiality of offering utilities to choose the type of test year that best suits them. The letter also recommended that this issue be discussed at the next possible open meeting. On July 9, 2024, at an open meeting, ACC Commissioners discussed objectives of future regulatory lag workshops and voted to schedule at least one more workshop on this topic later this year. The ACC held an additional workshop on October 3, 2024 to discuss formula rate methodologies and their use in ratemaking. The workshop included presentations from representatives of FERC, customer advocates, other stakeholders, and utilities, including APS. APS cannot predict the outcome of this matter. Cost Recovery Mechanisms APS has received regulatory decisions that allow for more timely recovery of certain costs outside of a general retail rate case through the following recovery mechanisms. See “2022 Retail Rate Case” above for modifications of adjustment mechanisms in the 2022 Rate Case. Renewable Energy Standard . In 2006, the ACC approved the renewable energy standard (“RES”). Under the RES, electric utilities that are regulated by the ACC must supply an increasing percentage of their retail electric energy sales from eligible renewable resources, including, for example, solar, wind, biomass, biogas and geothermal technologies. In order to achieve these requirements, the ACC allows APS to include a RES surcharge as part of customer bills to recover the approved amounts for use on renewable energy projects. Each year, APS is required to file a five-year implementation plan with the ACC and seek approval for funding the upcoming year’s RES budget. In 2015, the ACC revised the RES rules to allow the ACC to consider all available information, including the number of rooftop solar arrays in a utility’s service territory, to determine compliance with the RES. In June 2021, the ACC adopted a clean energy rules package which would require APS to meet certain clean energy standards and technology procurement mandates, obtain approval for its action plan included in its Integrated Resource Plan (“IRP”), and seek cost recovery in a rate process. Since the adopted clean energy rules differed substantially from the original Recommended Order and Opinion, supplemental rulemaking procedures were required before the rules could become effective. On January 26, 2022, the ACC reversed its prior decision and declined to send the final draft energy rules through the rulemaking process. Instead, the ACC opened a new docket to consider ASRFP requirements and the IRP process. See “Energy Modernization Plan” below for more information. On July 1, 2021, APS filed its 2022 RES Implementation Plan and proposed a budget of approximately $93.1 million. APS filed an amended 2022 RES Implementation Plan on December 9, 2021, with a proposed budget of $100.5 million. This budget included funding for programs to comply with the decision in the 2019 Rate Case, including the ACC authorizing spending $20 million to $30 million in capital costs for the continuation of the APS Solar Communities program each year for a period of three years from the effective date of the 2019 Rate Case decision. APS’s budget proposal supported existing approved projects and commitments and requested a waiver of the RES residential and non-residential distributed energy requirements for 2022. On May 18, 2022, the ACC approved the 2022 RES Implementation Plan, including an amendment requiring a stakeholder working group convene to develop a community solar program for the ACC’s consideration at a future date. On July 1, 2022, APS filed its 2023 RES Implementation Plan and proposed a budget of approximately $86.2 million, excluding any funding offsets. This budget contained funding for programs to comply with ACC-approved initiatives, including the 2019 Rate Case decision. APS’s budget proposal supported existing approved projects and commitments and requested a waiver of the RES residential and non-residential distributed energy requirements for 2022. On November 10, 2022, the ACC approved the 2023 RES Implementation Plan, including APS’s requested waiver of the distributed energy requirement for 2023. On September 23, 2022, APS filed a community solar proposal in compliance with the ACC order that was informed by a stakeholder working group. APS proposed a small, pilot-scale program size of up to 140 MW that would be selected through a competitive ASRFP. The ACC has not yet ruled on the proposal. However, on November 10, 2022, the ACC approved a bifurcated community solar process, directing ACC Staff to develop a statewide policy through additional stakeholder involvement and establishing a separate evidentiary hearing to define other policy components. On March 23, 2023, the ACC approved a policy statement that included information on how statewide community solar and storage programs should be structured, their location, and inclusion in ASRFPs. The remainder of the community solar program policy components were deferred to the ACC’s Hearing Division so that a formal evidentiary hearing could be held to consider issues of substance related to community solar. On March 5, 2024, the ACC ordered APS to not expand or extend the APS Solar Communities program. Consistent with that decision, the Solar Communities program has been discontinued and APS stopped enrolling new customers. APS will continue work on projects that were in the queue prior to that decision. On June 30, 2023, APS filed its 2024 RES Implementation Plan and proposed a budget of approximately $95.1 million. APS’s budget proposal supports existing approved projects and commitments and requests a waiver of the RES renewable energy credit requirements to demonstrate compliance with the Annual Renewable Energy Requirement for 2023. The ACC has not yet ruled on the 2024 RES Implementation Plan. APS cannot predict the outcome of this proceeding. On June 28, 2024, APS filed an application for approval of modifications to its Green Power Partners Program (“GPP”) and requested a renewable generation renewable energy credits waiver. The ACC has not yet ruled on the GPP application. APS cannot predict the outcome of this proceeding. On July 1, 2024, APS filed its 2025 RES Implementation Plan and proposed a budget of approximately $92.7 million. APS’s budget proposal supports existing approved projects and commitments and requests a waiver of the RES renewable energy credit requirements to demonstrate compliance with the Annual Renewable Energy Requirement for 2024. The ACC has not yet ruled on the 2025 RES Implementation Plan. APS cannot predict the outcome of this proceeding. Demand Side Management Adjustor Charge . The ACC Electric Energy Efficiency Standards require APS to submit a DSM Implementation Plan annually for review and approval by the ACC. Verified energy savings from APS’s resource savings projects can be counted toward compliance with the Electric Energy Efficiency Standards; however, APS is not allowed to count savings from systems savings projects toward determination of the achievement of performance incentives, nor may APS include savings from these system savings projects in the calculation of its LFCR mechanism. See below for discussion of the LFCR. On December 17, 2021, APS filed its 2022 D SM Implementation Plan in accordance with an extension granted in 2021. The 2022 DSM Plan requested a budget of $78.4 million and represents an increase of approximately $14 million in DSM spending above 2021. On November 10, 2022, the ACC approved the 2022 DSM Implementation Plan, including a proposed performance incentive. On June 1, 2022, APS filed its 2023 Transportation Electrification Plan (“2023 TE Plan”). The 2023 TE Plan detailed APS’s efforts to support transportation electrification in Arizona, including the Take Charge AZ Pilot Program and customer education and outreach related to transportation electrification. Subsequently, APS filed an amended 2023 TE Plan on November 30, 2022, that included a request for a $5 million budget. On December 12, 2023, the ACC approved the 2023 TE Plan without including the Take Charge AZ Program and its budget going forward, but allowed APS to complete projects already underway. Additionally, the ACC discontinued the residential EV SmartCharger rebate and approved modifications to the EV rate plan. On November 30, 2022, APS filed its 2023 DSM Implementation Plan, which requested a budget of $88 million. On M ay 31, 2023, APS filed an amended 2023 DSM Implementation Plan. The amended plan maintained the originally proposed budget of $88 million. Subsequent to filing the amended 2023 DSM Implementation Plan and prior to the ACC approving it, on November 30, 2023, APS filed its 2024 DSM Implementation Plan. The 2024 DSM Implementation Plan requested a total budget of $91.5 million and incorporated all elements of the amended 2023 DSM Implementation Plan as well as the 2024 TE Implementation Plan. On April 26, 2024, APS filed an amendment to the 2024 DSM Implementation Plan. The amended 2024 DSM Implementation Plan includes an updated budget of $90.9 million to reflect removal of incentive funds for the Level 2 Smart Charger rebate within the EV Charging Demand Management Pilot, an update on the performance incentive calculation, and the withdrawal of tranches two and three of the residential battery pilot. The ACC has not yet ruled on the amended 2024 DSM Implementation Plan. In a letter filed May 31, 2024, APS said it would not file a 2025 DSM Implementation Plan pending ACC review of the amended 2024 DSM Implementation Plan. APS cannot predict the outcome of this proceeding. Power Supply Adjustor Mechanism and Balance. The PSA provides for the adjustment of retail rates to reflect variations primarily in retail fuel and purchased power costs. The PSA is subject to specified parameters and procedures, including the following: • APS records deferrals for recovery or refund to the extent actual retail fuel and purchased power costs vary from the Base Fuel Rate; • an adjustment to the PSA rate is made annually each February 1 (unless otherwise approved by the ACC) and goes into effect automatically unless suspended by the ACC; • the PSA uses a forward-looking estimate of fuel and purchased power costs to set the annual PSA rate, which is reconciled to actual costs experienced for each PSA Year (February 1 through January 31) (see the following bullet point); • the PSA rate includes (a) a “forward component,” under which APS recovers or refunds differences between expected fuel and purchased power costs for the upcoming calendar year and those embedded in the Base Fuel Rate; (b) a “historical component,” under which differences between actual fuel and purchased power costs and those recovered or refunded through the combination of the Base Fuel Rate and the forward component are recovered during the next PSA Year; and (c) a “transition component,” under which APS may seek mid-year PSA changes due to large variances between actual fuel and purchased power costs and the combination of the Base Fuel Rate and the forward component; and • the PSA rate may not be increased or decreased more than $0.006 per kWh in a year without permission of the ACC. The following table shows the changes in the deferred fuel and purchased power regulatory asset for 2024 and 2023 (dollars in thousands): Nine Months Ended 2024 2023 Balance at beginning of period $ 463,195 $ 460,561 Deferred fuel and purchased power costs 244,109 486,382 Amounts charged to customers (340,030) (420,277) Balance at end of period $ 367,274 $ 526,666 On November 30, 2021, APS filed its PSA rate for the PSA year beginning February 1, 2022. That rate was $0.007544 per kWh, which consisted of a forward component of $(0.004842) per kWh and a historical component of $0.012386 per kWh. The 2022 PSA rate was a $0.004 per kWh increase compared to the 2021 PSA year, which is the maximum permitted under the Plan of Administration for the PSA. These rates went into effect as filed on February 1, 2022. On April 1, 2022, the ACC filed a final report of its third-party audit findings regarding APS’s fuel and purchased power costs for the period January 2019 through January 2021. The report contained an in-depth review of APS’s fuel and purchased power contracts, its monthly fuel accounting activities, its forecasting and dispatching procedures, and its monthly PSA filings, among other fuel-related activities. The report found that APS’s fuel processing accounting practices, dispatching procedures, and procedures for hedging activity were reasonable and appropriate. The report included several recommendations for the ACC’s consideration, including review of current contracts, maintenance schedules, and certain changes and improvements to the schedules in APS’s monthly PSA filings. On December 27, 2022, ACC Staff filed a proposed order supporting adoption of the recommendations in the third-party audit report, and the ACC approved the proposed order on February 22, 2023. On November 30, 2022, APS filed its PSA rate for the PSA year beginning February 1, 2023. In this filing, APS also requested that one of three different options be adopted to address the growing undercollected PSA balance. On February 23, 2023, the ACC approved an overall PSA rate of $0.019074 per kWh, which consisted of a forward component of $(0.005527) per kWh, a historical component of $0.013071 per kWh and a transition component of $0.011530 per kWh, that will continue until further notice of the ACC. The rate became effective with the first billing cycle in March 2023 and is designed to bring the PSA balancing account to near-zero over a 24-month period. On November 30, 2023, APS notified the ACC that it will be maintaining the current PSA rate of $0.019074 per kWh and an updated PSA adjustment schedule would not be filed at that time. In Decision No. 79293 in the 2022 Rate Case, the ACC approved a permanent increase in the annual PSA adjustor rate cap from $0.004 per kWh to $0.006 per kWh and a requirement that APS report to the ACC for possible action when the overall PSA balance reaches $100 million. As part of the 2022 Rate Case decision, the ACC also approved an overall PSA rate of $0.011977 per kWh, which consisted of a forward component of $(0.012624) per kWh, a historical component of $0.013071 per kWh, and a transition component of $0.011530 per kWh. The overall PSA rate was reduced to offset an increase in base fuel prices. The rate became effective on March 8, 2024. As a result of the 2022 Rate Case decision, the requirement to seek approval for recovery of costs related to third-party storage systems through the PSA adjustment mechanism was removed. Prior to this decision, APS was required to seek ACC approval to recover costs related to third-party energy storage systems through its PSA adjustment mechanism. In 2023, nine energy storage PPAs and their respective costs were approved for recovery through the PSA. In 2022, one energy storage PPA and its costs was approved for recovery through the PSA. In 2021, four energy storage PPAs and their respective costs were approved for recovery through the PSA. However, one energy storage PPA that was approved in 2021 was later terminated by APS due to project delays. Environmental Improvement Surcharge. On March 5, 2024, the ACC approved the elimination of the EIS, and the surcharge is no longer in effect. The EIS permitted APS to recover the capital carrying costs (rate of return, depreciation and taxes) plus incremental operations and maintenance expenses associated with environmental improvements made outside of a test year to comply with environmental standards set by federal, state, tribal, or local laws and regulations. APS’s February 1, 2023 EIS application requested an increase in the charge to $14.7 million, or $3.3 million over the prior-period charge. On March 10, 2023, APS filed an amended application requesting an EIS charge of $4.0 million, a decrease of $10.7 million from the February EIS request and a decrease of $7.5 million from the prior-period charge. The revised 2023 EIS became effective with the first billing cycle in April 2023; however, with the elimination of the surcharge, it is no longer in effect, and any remaining amounts are being collected through base rates. Transmission Rates, Transmission Cost Adjustor and Other Transmission Matters . In July 2008, FERC approved a modification to APS’s Open Access Transmission Tariff to allow APS to move from fixed rates to a formula rate-setting methodology in order to more accurately reflect and recover the costs that APS incurs in providing transmission services. A large portion of the rate represents charges for transmission services to serve APS’s retail customers (“Retail Transmission Charges”). In order to recover the Retail Transmission Charges, APS was previously required to file an application with, and obtain approval from, the ACC to reflect changes in Retail Transmission Charges through the TCA. Under the terms of the settlement agreement entered into in 2012 regarding APS’s rate case, however, an adjustment to rates to recover the Retail Transmission Charges will be made annually each June 1 and will go into effect automatically unless suspended by the ACC. The formula rate is updated each year effective June 1 on the basis of APS’s actual cost of service, as disclosed in APS’s FERC Form 1 report for the previous fiscal year. Items to be updated include actual capital expenditures made as compared with previous projections, transmission revenue credits and other items. APS reviews the proposed formula rate filing amounts with the ACC Staff. Any items or adjustments which are not agreed to by APS and the ACC Staff can remain in dispute until settled or litigated with FERC. Settlement or litigated resol |