Commitments and Contingencies | Indemnities Edison International and SCE have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business. Edison International and SCE have agreed to provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, indemnities for specified environmental liabilities and income taxes with respect to assets sold or other contractual arrangements. Edison International's and SCE's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International and SCE may have recourse against third parties. Edison International and SCE have not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated. Contingencies In addition to the matters disclosed in these Notes, Edison International and SCE are involved in other legal, tax, and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International and SCE believe the outcome of each of these other proceedings will not materially affect its financial position, results of operations and cash flows. Southern California Wildfires and Mudslides Wildfires in SCE's territory, including those where SCE's equipment may be alleged to be associated with the fire's ignition, have caused loss of life and substantial damage in recent years. Multiple factors have contributed to increased wildfire activity and faster progression of wildfires across SCE's service territory and in other areas of California. These include the buildup of dry vegetation in areas severely impacted by years of historic drought, lack of adequate clearing of hazardous fuels by responsible parties, higher temperatures, lower humidity, increased incidence of dry lightning, and strong Santa Ana winds. At the same time that wildfire risk has been increasing in Southern California, residential and commercial development has occurred and is occurring in some of the highest-risk areas. Such factors can increase the likelihood and extent of wildfires. SCE has determined that approximately 27% of its service territory is in areas identified as high fire risk. California has experienced unprecedented weather conditions in recent years due to climate change, and SCE's service territory remains susceptible to additional wildfire activity in 2021 and beyond. The worsening weather and fuel conditions across California increase the likelihood of wildfires, including those where SCE's equipment may be alleged to be associated with the fire's ignition. In response to worsening conditions and increased wildfire activity over the past several years, SCE has developed and is implementing its 2020 – 2022 Wildfire Mitigation Plan ("WMP") to reduce the risk of SCE equipment contributing to the ignition of wildfires. In addition, California has increased its investment in wildfire prevention and fire suppression capabilities. In addition to the investments SCE is making as part of its WMP, SCE also uses Public Safety Power Shutoffs ("PSPS") to proactively de-energize power lines as a last resort to mitigate the risk of catastrophic wildfires during extreme weather events. SCE initiated PSPS 12 times in 2020 as part of its wildfire mitigation efforts, impacting an aggregate of approximately 145,000 unique customers. In January 2021, the President of the CPUC sent SCE a letter expressing her concern regarding SCE's execution of PSPS in 2020 and notifying SCE that it must implement a PSPS action plan to reduce the impacts of PSPS on the customers and communities it serves. On a risk-informed basis, SCE is making efforts to reduce the frequency and impacts of PSPS in 2021 as compared to 2020, assuming that weather patterns in the 2021 are similar to those experienced in 2020. SCE had initiated PSPS eight times in 2021 as of October 26, 2021, impacting an aggregate of approximately 98,000 unique customers. The 2021 events consist of a January 2021 event that impacted approximately 98,000 unique customers and seven other events that impacted an aggregate of approximately 300 unique customers. SCE may be subject to mandated changes to, or restrictions on, its operational PSPS practices, regulatory fines and penalties, claims for damages and reputational harm if SCE does not execute PSPS in compliance with applicable rules and regulations or if it is determined that SCE has placed excessive or unreasonable reliance on PSPS. In June 2021, the CPUC issued a final decision which, among other things, will reduce future authorized revenue for the volumetric reductions in electricity sales resulting from PSPS events initiated after June 2021 until the CPUC determines that improvements in the PSPS program have been made. Edison International and SCE have incurred material losses in connection with the 2017/2018 Wildfire/Mudslide Events, which are described below. SCE's equipment has been, and may further be, alleged to be associated with several wildfires that have originated in Southern California subsequent to 2018. Edison International and SCE expect that any losses incurred in connection with those fires will be covered by insurance, subject to self-insured retentions and co-insurance, or third-party receivables, and expect that any such losses after recoveries will not be material. Liability Overview The extent of liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether the utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be required to show negligence in addition to causation. California courts have previously found utilities to be strictly liable for property damage along with associated interest and attorneys' fees, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. If inverse condemnation is held to be inapplicable to SCE in connection with a wildfire, SCE still could be held liable for property damages and associated interest if the property damages were found to have been proximately caused by SCE's negligence. If SCE were to be found negligent, SCE could also be held liable for, among other things, fire suppression costs, business interruption losses, evacuation costs, clean-up costs, medical expenses, and personal injury/wrongful death claims. Additionally, SCE could potentially be subject to fines and penalties for alleged violations of CPUC rules and state laws investigated in connection with the ignition of a wildfire. Final determinations of liability for wildfire events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes. Even when investigations are still pending or liability is disputed, an assessment of likely outcomes, including through future settlement of disputed claims, may require estimated losses to be accrued under accounting standards. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to wildfire events. The process for estimating losses associated with alleged and potential wildfire related claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims. As additional information becomes available, management's estimates and assumptions regarding the causes and financial impact of wildfire events may change. For instance, as a result of additional information, management increased its estimated losses for the 2017/2018 Wildfire/Mudslide Events (as defined below) in the third quarter of 2021. 2017/2018 Wildfire/Mudslide Events Wildfires in SCE's territory in December 2017 and November 2018 caused loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The investigating government agencies, the Ventura County Fire Department ("VCFD") and California Department of Forestry and Fire Protection ("CAL FIRE"), have determined that the largest of the 2017 fires in SCE's territory originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by a second fire that originated near Koenigstein Road in the City of Santa Paula (the "Koenigstein Fire"). The December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. According to CAL FIRE, the Thomas and Koenigstein Fires, collectively, burned over 280,000 acres, destroyed or damaged an estimated 1,343 structures and resulted in two confirmed fatalities. The largest of the November 2018 fires in SCE's territory, known as the "Woolsey Fire," originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties. According to CAL FIRE, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three confirmed fatalities. Four additional fatalities are alleged to have been associated with the Woolsey Fire. As described below, multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by debris flows and flooding in Montecito and surrounding areas in January 2018 (the "Montecito Mudslides") based on a theory alleging that SCE has responsibility for the Thomas and/or Koenigstein Fires and further alleging that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in 21 confirmed fatalities, with two additional fatalities presumed. One of the presumed fatalities has been confirmed. The Thomas Fire, the Koenigstein Fire, the Montecito Mudslides (defined below) and the Woolsey Fire are each referred to as a "2017/2018 Wildfire/Mudslide Event," and, collectively, referred to as the "2017/2018 Wildfire/Mudslide Events." Based on information available to SCE and consideration of the risks associated with litigation, Edison International and SCE expect to incur a material loss in connection with the remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The 2017/2018 Wildfire/Mudslide Events are discussed further below. Recent developments As of September 30, 2021, in addition to the Local Public Entity Settlement, the TKM Subrogation Settlement and the Woolsey Subrogation Settlement (all defined below), SCE has entered into settlements with approximately 4,000 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it has agreed to pay an aggregate of approximately $1.5 billion. In addition, in October 2021, SCE and the SED executed an agreement (the "SED Agreement") , subject to CPUC approval, to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events and three other 2017 wildfires for, among other things, aggregate costs of $550 million. The $550 million in costs is comprised of a $110 million fine to be paid to the State of California General Fund, $65 million of shareholder-funded safety measures, and an agreement by SCE to waive its right to seek cost recovery in CPUC-jurisdictional rates for $375 million of third-party uninsured claims payments (the "SED Excluded Losses"). The SED Agreement provides that SCE may, on a permanent basis, exclude from its ratemaking capital structure any after-tax charges to equity or debt borrowed to finance costs incurred under the SED Agreement. The SED Agreement also imposes other obligations on SCE, including reporting requirements and safety-focused studies. SCE's obligations under the SED Agreement commence after CPUC approval of the SED Agreement is final and non-appealable. In the SED Agreement, SCE did not admit imprudence, negligence or liability with respect to the 2017/2018 Wildfire/Mudslide Events. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The net result of management's third quarter 2021 review, including a review of information obtained as a result of achieving key milestones in the litigation process, including settlement activity to date and the expiration of some statutes of limitations, billion ($894 million after-tax). The estimated losses for the 2017/2018 Wildfire/Mudslide Events as of September 30, 2021 reflect the impact of the SED Agreement. As of September 30, 2021, Edison International and SCE had paid $5.2 billion in settlements, had $84 million to be paid under executed settlements and had $2.2 billion of estimated losses for remaining alleged and potential claims reflected on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. As of the same date, Edison International and SCE had assets for expected recoveries through FERC electric rates of $162 million on their consolidated balance sheets and had exhausted expected insurance recoveries related to the 2017/2018 Wildfire/Mudslide Events. Estimated losses for the 2017/2018 Wildfire/Mudslide Events litigation are based on a number of assumptions and are subject to change as additional information becomes available. Actual losses incurred may be higher or lower than estimated based on several factors, including: the uncertainty in estimating damages that have been or may be alleged, the ability to reach settlements through the ongoing claims mediation processes, uncertainties related to the litigation processes, uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge and whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the uncertainty as to how these factors impact future settlements. The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. SCE will seek rate recovery of prudently-incurred, actual losses realized in connection with the 2017/2018 Wildfire/Mudslide Events in excess of available insurance, other than for CPUC-jurisdictional rate recovery of the $375 million of SED Excluded Losses. See "Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates" below for additional information. External Investigations and Internal Review The VCFD and CAL FIRE have jointly issued reports concerning their findings regarding the causes of the Thomas Fire and the Koenigstein Fire. The reports did not address the causes of the Montecito Mudslides. SCE has also received a non-final redacted draft of a report from the VCFD regarding Woolsey Fire (the "Redacted Woolsey Report"). SCE anticipates that the VCFD will release its final report regarding the Woolsey Fire in 2021. The VCFD and CAL FIRE findings do not determine legal causation of or assign legal liability for the Thomas, Koenigstein or Woolsey Fires; final determinations of legal causation and liability would only be made during lengthy and complex litigation. The CPUC's Safety and Enforcement Division ("SED") has conducted investigations to assess SCE's compliance with applicable rules and regulations in areas impacted by the Thomas, Koenigstein and Woolsey Fires. As discussed above, in October 2021, SCE and the SED executed the SED Agreement, subject to CPUC approval, to resolve the SED's investigations into the 2017/2018 Wildfire/Mudslide Events. If the SED Agreement is not approved by the CPUC, the CPUC may initiate proceedings to investigate these matters and SCE could be subject to material fines or penalties in connection with any such proceeding that is initiated. The California Attorney General's Office has completed its investigation of the Thomas Fire and the Woolsey Fire without pursuing criminal charges. SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is complex and time consuming. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation processes. Thomas Fire On March 13, 2019, the VCFD and CAL FIRE jointly issued a report concluding, after ruling out other possible causes, that the Thomas Fire was started by SCE power lines coming into contact during high winds, resulting in molten metal falling to the ground. However, the report does not state that their investigation found molten metal on the ground. At this time, based on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the report's indicated start time, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's system and at least 15 minutes prior to the start time indicated in the report. SCE is continuing to assess the extent of damages that may be attributable to the Thomas Fire. Koenigstein Fire On March 20, 2019, the VCFD and CAL FIRE jointly issued a report finding that the Koenigstein Fire was caused when an energized SCE electrical wire separated and fell to the ground along with molten metal particles and ignited the dry vegetation below. As previously disclosed, SCE believes that its equipment was associated with the ignition of the Koenigstein Fire. SCE is continuing to assess the extent of damages that may be attributable to the Koenigstein Fire. Montecito Mudslides SCE's internal review includes inquiry into whether the Thomas and/or Koenigstein Fires proximately caused or contributed to the Montecito Mudslides, whether, and to what extent, the Thomas and/or Koenigstein Fires were responsible for the damages in the Montecito area and other factors that potentially contributed to the losses that resulted from the Montecito Mudslides. Many other factors, including, but not limited to, weather conditions and insufficiently or improperly designed and maintained debris basins, roads, bridges and other channel crossings, could have proximately caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. At this time, based on available information, SCE has not been able to determine whether the Thomas Fire or the Koenigstein Fire, or both, were responsible for the damages in the Montecito area. In the event that SCE is determined to have caused the fire that spread to the Montecito area, SCE cannot predict whether, if fully litigated, the courts would conclude that the Montecito Mudslides were caused or contributed to by the Thomas and/or Koenigstein Fires or that SCE would be liable for some or all of the damages caused by the Montecito Mudslides. Woolsey Fire SCE's internal review into the facts and circumstances of the Woolsey Fire is ongoing. SCE has reported to the CPUC that there was an outage on SCE's electric system in the vicinity of where the Woolsey Fire reportedly began on November 8, 2018. SCE is aware of witnesses who saw fire in the vicinity of SCE's equipment at the time the fire was first reported. While SCE did not find evidence of downed electrical wires on the ground in the suspected area of origin, it observed a pole support wire in proximity to an electrical wire that was energized prior to the outage. The Redacted Woolsey Report states that the VCFD investigation team determined that electrical equipment owned and operated by SCE was the cause of the Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment was associated with the ignition of the Woolsey Fire. SCE expects to obtain and review additional information and materials in the possession of CAL FIRE and others during the course of its internal review and the Woolsey Fire litigation process, including SCE equipment that has been retained by CAL FIRE. Litigation Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. Because potential plaintiffs can still timely file claims related to some of the 2017/2018 Wildfire/Mudslide Events, SCE expects to be the subject of additional lawsuits related to the events. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs. As of October 26, 2021, SCE was aware of at least currently pending 280 lawsuits, representing approximately 3,000 plaintiffs, related to the Thomas and Koenigstein Fires naming SCE as a defendant. One hundred fifty-one of the 280 lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least four of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties allege, among other things, negligence, inverse condemnation, trespass, private nuisance, and violations of the public utilities and health and safety codes. An initial trial for a limited number of plaintiffs, sometimes referred to as a bellwether trial, on certain fire only matters is currently scheduled for March 17, 2022. The bellwether trial date may be further delayed to provide SCE and certain of the individual plaintiffs in the Thomas and Koenigstein Fire litigation the opportunity to pursue settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs have, and others may, opt to pursue trial outside of the settlement program. Seventy-three of the 280 pending lawsuits mentioned in the paragraph above allege that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides, resulting in the plaintiffs' claimed damages. Forty-seven of the 73 Montecito Mudslides lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. In addition to other causes of action, some of the Montecito Mudslides lawsuits also allege personal injury and wrongful death. A bellwether jury trial previously scheduled for October 12, 2020 was vacated due to the wide-spread disruption being caused by the COVID-19 pandemic. As of October 26, 2021, SCE was aware of at least 348 currently pending lawsuits, representing approximately 7,000 plaintiffs, related to the Woolsey Fire naming SCE as a defendant. Two hundred eighty-four of the 348 lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least two of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura and Los Angeles Counties allege, among other things, negligence, inverse condemnation, personal injury, wrongful death, trespass, private nuisance, and violations of the public utilities and health and safety codes. A bellwether jury trial previously scheduled for October 26, 2021 has been vacated to provide SCE and certain of the individual plaintiffs in the Woolsey Fire litigation the opportunity to pursue settlements of claims under a mediation program adopted to promote an efficient and orderly settlement process. Some individual plaintiffs may opt to pursue trial outside of the settlement program. The Thomas and Koenigstein Fires and Montecito Mudslides lawsuits are being coordinated in the Los Angeles Superior Court. The Woolsey Fire lawsuits have also been coordinated in the Los Angeles Superior Court. On October 4, 2018, the Superior Court denied Edison International's and SCE's challenge to the application of inverse condemnation to SCE with respect to the Thomas and Koenigstein Fires and, on February 26, 2019, the California Supreme Court denied SCE's petition to review the Superior Court's decision. In January 2019, SCE filed a cross-complaint against certain local public entities alleging that failures by these entities, such as failure to adequately plan for flood hazards and build and maintain adequate debris basins, roads, bridges and other channel crossings, among other things, caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. These cross-claims in the Montecito Mudslides litigation were not released as part of the Local Public Entity Settlements (as defined below). Additionally, in September 2018, a derivative lawsuit for breach of fiduciary duties and unjust enrichment was filed in the Los Angeles Superior Court against certain current and former members of the Boards of Directors of Edison International and SCE. Edison International and SCE are identified as nominal defendants in the action. The derivative lawsuit generally alleges that the individual defendants violated their fiduciary duties by causing or allowing SCE to operate in an unsafe manner in violation of relevant regulations, resulting in substantial liability and damage from the Thomas and Koenigstein Fires and the Montecito Mudslides. The lawsuit is currently stayed. In November 2018, a purported class action lawsuit alleging securities fraud and related claims was filed in federal court against Edison International, SCE and certain current and former officers of Edison International and SCE. The plaintiff alleges that Edison International and SCE made false and/or misleading statements in filings with the Securities and Exchange Commission by failing to disclose that SCE had allegedly failed to maintain its electric transmission and distribution networks in compliance with safety regulations, and that those alleged safety violations led to fires that occurred in 2017 and 2018, including the Thomas Fire and the Woolsey Fire. In April 2021, the court granted a motion to dismiss the lawsuit. The plaintiff has appealed the dismissal to the United States Court of Appeals for the Ninth Circuit. In January 2019, two separate derivative lawsuits alleging breach of fiduciary duties, securities fraud, misleading proxy statements, unjust enrichment, and related claims were filed in federal court against certain current and former members of the Boards of Directors and certain current and former officers of Edison International and SCE. Edison International and SCE are named as nominal defendants in those actions. The derivative lawsuits generally allege that the individual defendants breached their fiduciary duties and made misleading statements or allowed misleading statements to be made (i) between March 21, 2014 and August 10, 2015, with respect to certain ex parte ex parte Settlements In the fourth quarter of 2019, SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Wildfire/Mudslide Events (the "Local Public Entity Settlements"). In the third quarter of 2020, Edison International and SCE entered into an agreement (the "TKM Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation (the "TKM Subrogation Plaintiffs") collective claims arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides have been resolved. Under the TKM Subrogation Settlement, SCE paid the TKM Subrogation Plaintiffs an aggregate of $1.2 billion in October 2020 and also agreed to pay $0.555 for each dollar in claims to be paid by the TKM Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap. In January 2021, Edison International and SCE entered into an agreement (the "Woolsey Subrogation Settlement") under which all of the insurance subrogation plaintiffs' in the Woolsey Fire litigation (the "Woolsey Subrogation Plaintiffs") collective claims arising from the Woolsey Fire have been resolved. Under the Woolsey Subrogation Settlement, SCE paid the Woolsey Subrogation Plaintiffs an aggregate of $2.2 billion in March and April 2021. SCE has also agreed to pay $0.67 for each dollar in claims to be paid by the Woolsey Subrogation Plaintiffs to their policy holders on or before July 15, 2023, up to an agreed upon cap. As of September 30, 2021, SCE has also entered into settlements with approximately 4,000 individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation. In 2020, SCE entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $300 million to those individual plaintiffs. Between December 31, 2020 and September 30, 2021, SCE also entered into settlements with individual plaintiffs in the 2017/2018 Wildfire/Mudslide Events litigation under which it agreed to pay an aggregate of approximately $1.2 billion to those individual plaintiffs. Edison International and SCE did not admit wrongdoing or liability as part of any of the settlements described above. Other claims and potential claims related to the 2017/2018 Wildfire/Mudslide Events remain. SCE continues to explore reasonable settlement opportunities with other plaintiffs in the outstanding 2017/2018 Wildfire/Mudslide Events litigation. Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates At September 30, 2021 and December 31, 2020, Edison International's and SCE's consolidated balance sheets include fixed payments to be made under executed settlement agreements and accrued estimated losses of $2.3 billion and $4.4 billion, respectively, for the 2017/2018 Wildfire/Mudslide Events. The following table presents changes in estimated losses since December 31, 2020: (in millions) Balance at December 31, 2020 1 $ 4,383 Increase in accrued estimated losses to reflect best estimate 1,265 Amounts paid (3,392) Balance at September 30, 2021 2 $ 2,256 1 At December 31, 2020, $2,231 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes an estimate for claims brought by insurance subrogation plaintiffs in the Woolsey Fire litigation, which were settled on January 22, 2021 for $2,212 million, and $19 million of other settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At December 31, 2020, the $2,281 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International and SCE's best estimate of expected losses for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events after giving effect to the Woolsey Subrogation Settlement of $2,152 million and other wildfire-related claims estimates of $129 million. 2 At September 30, 2021, $84 million in current liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets consists of settlements executed in connection with the 2017/2018 Wildfire/Mudslide Events. At September 30, 2021, the $2,308 million included in deferred credits and other liabilities, wildfire-related claims, on Edison International's and SCE's consolidated balance sheets includes Edison International and SCE's best estimate of expected losses for remaini |