Debt and Financing Obligations | Note 16. Debt and Financing Obligations Debt as of July 31, 2020 and October 31, 2019 consisted of the following: July 31, October 31, 2020 2019 Orion Energy Partners Credit Facility $ 80,000 $ 14,500 Connecticut Green Bank Loans 10,043 7,555 Liberty Bank Term Loan Agreement (BFC Loan) 10,069 11,632 Fifth Third Bank Term Loan Agreement (BFC Loan) 10,069 11,632 Finance obligation for sale-leaseback transactions 49,329 45,219 State of Connecticut Loan 9,660 10,000 New Britain Renewable Energy Term Loan — 497 Enhanced Capital Term Loan and Security Agreement — 1,500 Fifth Third Bank Construction Loan Agreement — 11,072 Liberty Bank Promissory Note (PPP Note) 6,515 — Capitalized lease obligations 56 141 Deferred finance costs (4,160 ) (3,180 ) Unamortized debt discount (5,336 ) (4,251 ) Total debt and financing obligations $ 166,245 $ 106,317 Current portion of long-term debt and financing obligations (17,692 ) (21,916 ) Long-term debt and financing obligations $ 148,553 $ 84,401 Orion Energy Partners Investment Agent, LLC Credit Agreement On October 31, 2019, the Company and certain of its affiliates as guarantors entered into a Credit Agreement (as amended from time to time, the “Orion Credit Agreement”) with Orion Energy Partners Investment Agent, LLC, as Administrative Agent and Collateral Agent (the “Agent”), and certain lenders affiliated with the Agent for a $200.0 million senior secured credit facility (the “Orion Facility”), structured as a delayed draw term loan to be provided by the lenders primarily to fund certain of the Company’s construction and related costs for fuel cell projects which meet the requirements of the Orion Facility. Under the Orion Credit Agreement, each lender will fund its commitments on each funding date in an amount equal to the principal amount of the loans to be funded by such lender on such date, less 2.50% of the aggregate principal amount of the loans funded by such lender on such date (the “Loan Discount). On October 31, 2019, the Company drew down $14.5 million (the “Initial Funding”) and received $14.1 million after taking into account a Loan Discount of $0.4 million. On November 22, 2019, a second draw (the “Second Funding”) of $65.5 million, funded by Orion Energy Credit Opportunities Fund II, L.P., Orion Energy Credit Opportunities Fund II GPFA, L.P., Orion Energy Credit Opportunities Fund II PV, L.P., and Orion Energy Credit Opportunities FuelCell Co-Invest, L.P. (the “Orion Lenders”), The Company may draw the remainder of the Orion Facility, up to $120.0 million, over the first 18 months following the Initial Funding and subject to the Agent’s approval to fund project-related expenses consisting of: (i) construction costs, inventory and other capital expenditures of additional fuel cell projects with contracted cash flows (under PPAs with creditworthy counterparties) that meet or exceed a mutually agreed coverage ratio; and (ii) inventory, working capital, and other costs that may be required to be delivered by the Company on purchase orders, service agreements, or other binding customer agreements with creditworthy counterparties. Except as may be approved by the Agent and the Orion Lenders (and except as provided in the Fifth Orion Amendment), the Company cannot use the Orion Facility to fund its working capital or other expenses at the corporate level. The Orion Lenders and the Agent have broad approval rights over the Company’s ability to raise additional capital, obtain other debt financing, and draw, allocate and use funds from the Orion Facility Under the Orion Credit Agreement, cash interest of 9.9% per annum is paid quarterly. In addition to the cash interest, payment-in-kind interest of 2.05% per annum accrues which will be added to the outstanding principal balance of the Orion Facility but is paid quarterly in cash to the extent of available cash after payment of the Company’s operating expenses and the funding of certain reserves for the payment of outstanding indebtedness to the State of Connecticut and Connecticut Green Bank. The Orion Credit Agreement contains numerous representations, warranties and covenants. Outstanding principal under the Orion Facility will be amortized on a straight-line basis over a seven year term in quarterly payments beginning one year after the Initial Funding, with the initial payment due 21 business days after the end of the first quarter of fiscal 2021; provided that, if the Company does not have sufficient cash on hand to make any required quarterly amortization payments, such amounts shall be deferred and payable at such time as sufficient cash is available to make such payments subject to all outstanding principal being due and payable on the maturity date, which is the date that is eight years after the date of the Initial Funding or October 31, 2027. The issuance of the Initial Funding Warrants and recognition of the Second Funding Warrants resulted in $3.9 million being recorded as a liability as of October 31, 2019 with the offset recorded as a debt discount. Refer to Note 12. “Stockholders’ Equity and Warrant Liabilities” for additional information regarding the Initial Funding Warrants and Second Funding Warrants, including the accounting, terms and conversions during the quarter ended January 31, 2020. In conjunction with the Second Funding, the Company and the other loan parties entered into the First Amendment to the Orion Credit Agreement (the “First Orion Amendment”), which required the Company to establish a $5.0 million debt reserve, with such reserve to be released on the first date following the date of the Second Funding on which all of the following events shall have occurred: (a) each of (x) the commercial operation date for the Tulare BioMAT project shall have occurred and (y) a disposition, refinancing or tax equity investment in the Tulare BioMAT project of at least $5.0 million is consummated (both conditions (x) and (y) have been satisfied); (b) each of (x) the Groton Project shall have achieved its business plan in accordance with the Groton Construction Budget (as defined in the Orion Credit Agreement), (y) the commercial operation date for the Groton Project shall have occurred and (z) the Groton Project shall have met its annualized output and heat rate guarantees for three months; and (c) a disposition, refinancing or tax equity investment of at least $30 million shall have occurred with respect to the Groton Project. The First Orion Amendment further required the Company (i) to provide, no later than December 31, 2019, a biogas sale and purchase agreement through December 31, 2021 for the Tulare BioMAT project, which was obtained as of such date, (ii) to obtain by December 31, 2019, a fully executed contract for certain renewable energy credits for the Groton Project, which was obtained as of such date, and (iii) to provide by January 31, 2020, certain consents and estoppels from the Connecticut Municipal Electric Energy Cooperative (“CMEEC”) related to the Groton Project and an executed, seventh modification to the lease between CMEEC and the United States Government, acting by and through the Department of the Navy, both of which were obtained as of such date. In addition, in connection with the January 2020 Letter Agreement among the Company, FCE Ltd. and Enbridge described above, on January 20, 2020, in order to obtain the Orion Lenders’ consent to the January 2020 Letter Agreement as required under the Orion Credit Agreement, the Company, the Agent, the Orion Lenders, and the other loan parties entered into the Second Amendment to the Orion Credit Agreement (the “Second Orion Amendment”), which added a new affirmative covenant to the Orion Credit Agreement that obligates the Company to, and to cause FCE Ltd. to, on or prior to November 1, 2021, either (i) pay and satisfy in full all of their respective obligations in respect of, and fully redeem and cancel, all of the Series 1 Preferred Shares of FCE Ltd., or (ii) deposit in a newly created account of FCE Ltd. or the Company cash in an amount sufficient to pay and satisfy in full all of their respective obligations in respect of, and to effect a redemption and cancellation in full of, all of the Series 1 Preferred Shares of FCE Ltd. The Second Orion Amendment also provides that the amended articles of FCE Ltd. setting forth the modified terms of the Series 1 Preferred Shares will be considered a “Material Agreement” under the Orion Credit Agreement. Under the Second Orion Amendment, a failure to satisfy this new affirmative covenant or to otherwise comply with the terms of the Series 1 Preferred Shares will constitute an event of default under the Orion Credit Agreement, which could result in the acceleration of any amounts outstanding under the Orion Credit Agreement. Additionally, On April 30, 2020, the Company, the Agent, the Orion Lenders and the other loan parties entered into the Fourth Amendment to the Orion Credit Agreement (the “Fourth Orion Amendment”). Pursuant to the Fourth Orion Amendment, the Agent and the Orion Lenders agreed to permit the release of $3.5 million from the Project Proceeds Account (as defined in the Orion Credit Agreement) subject to the following terms and conditions. Pursuant to the Fourth Orion Amendment, the Company’s 1.4 MW biogas fueled project at the wastewater treatment plant in San Bernardino, California has been added as an Additional Covered Project (as defined in the Orion Credit Agreement), and the Company subsidiary developing such project, San Bernardino Fuel Cell, LLC, has been added as an Additional Covered Project Company (as defined in the Orion Credit Agreement) such that those covenants, terms and conditions in the Orion Credit Agreement that apply to Covered Projects and Covered Project Companies will now be applicable to the foregoing project and project company, including that the “Project Payoff Amount” (i.e., the amount required pursuant to the Orion Credit Agreement to be realized upon a subsequent sale or refinancing of a project) for the San Bernardino project will be $5 million. In May 2020, $2.3 million of the $3.5 million was released from the Project Proceeds Account, which account is restricted subject to the control of the Agent, and transferred to a General Business Unit Account (as defined in the Orion Credit Agreement), which account is unrestricted and available for general use by the Company. The remaining $1.2 million will be released from the Project Proceeds Account and transferred to a Covered Project Account (as defined in the Orion Credit Agreement) being established for the San Bernardino project for use in connection with the construction of the San Bernardino project upon satisfaction of the following conditions: (a) approval of a self-generation incentive program grant for the San Bernardino project in an amount equal to no less than $1.0 million; (b) approval of an interconnection agreement; (c) provision of a fuel affidavit approval by Southern California Gas Company; (d) issuance of an air permit for the anaerobic digester gas cleanup system; (e) provision of an executed consent to collateral assignment by The City of San Bernardino Municipal Water District; (f) recordation in the land records of San Bernardino County of a memorandum of site license; (g) after giving effect to the release and transfer of $1.2 million to the Covered Project Account, evidence that there will be sufficient cash in the Covered Project Account for the San Bernardino project to cover remaining expenditures and complete the project and (h) written approval of the Agent. On June 8, 2020, the Company, certain of its affiliates as guarantors, the Agent and the Orion Lenders entered into the Fifth Orion Amendment. Pursuant to the terms of the Fifth Orion Amendment, the Orion Lenders agreed to make a commitment to make certain loans to the Company in an aggregate principal amount of up to $35 million (which are referred to herein as the “Secondary Facility Loans”), and the Company, the guarantors, the Agent and the Orion Lenders agreed to amend the Orion Credit Agreement to facilitate the provision of such Secondary Facility Loans. Pursuant to the Orion Credit Agreement, as amended by the Fifth Orion Amendment, the Orion Lenders have committed to make Secondary Facility Loans up to an aggregate amount of $35 million available to the Company for general corporate purposes of the Company or the guarantors in accordance with either (i) the then-effective Operating Budget (as defined in the Orion Credit Agreement) of the Company or the guarantors or (ii) the cash use forecast delivered by the Company to the Agent on June 6, 2020. The Secondary Facility Loan commitment allows the Company to draw on the Secondary Facility Loans commencing on June 5, 2020 (the “Commencement Date”) and terminating on September 14, 2020 (the “Termination Date”). The Company may make draws on the Secondary Facility Loans in amounts of no less than $ 5 million, and no more than $ 15 million may be drawn in any 30- day period, provided that the Company may draw any remaining available funds under the Secondary Facility Loans between August 15, 2020 and the Termination Date. Any drawn amounts must be fully repaid on or before September 1, 2021 (the “Secondary Facility Repayment Date”). The amended Orion Credit Agreement contains representations and warranties, affirmative and negative covenants and events of default, including failure to make payments when due and termination of or default under certain material agreements as specified in the Orion Credit Agreement, that entitle the Agent and the Orion Lenders to cause the Company’s indebtedness under the amended Orion Credit Agreement to become immediately due and payable. In exchange for the Secondary Facility Loan commitment, the Company will pay to the Orion Lenders an option premium of $1 million on the earlier of the Termination Date and the date of full repayment of all amounts drawn on the Secondary Facility Loans. Such option premium is fully earned on the Commencement Date and non-refundable and non-creditable thereafter, and is due and payable whether or not any draw is ever made under the Secondary Facility Loan commitment. The Company recorded a pro-rata portion of the option premium as interest expense as of July 31, 2020. Additionally, for each draw made on the Secondary Facility Loans, the Company must pay to the Orion Lenders an initial draw discount of 5 10% 20 In connection with the Secondary Facility Loan commitment, the Company is providing additional collateral to the Orion Lenders by a pledge of all of the Company’s intellectual property assets. All liens on the Company’s intellectual property will be released upon full repayment of all amounts drawn under the Secondary Facility Loans or upon termination of the Secondary Facility Loan commitment if no amounts are drawn. Under the amended Orion Credit Agreement, cash interest of 9.9% per annum will be paid quarterly on all outstanding amounts under the Secondary Facility Loans. In addition to the cash interest, payment-in-kind interest of 2.05% per annum will accrue which will be added to the outstanding principal balance under the existing Orion Facility, but will be paid quarterly in cash to the extent of available cash after payment of the Company’s operating expenses and the funding of certain reserves for payment of outstanding indebtedness to the State of Connecticut and Connecticut Green Bank. Any drawn amounts on the Secondary Facility Loans may be prepaid at any time without penalty. The Company is required to prepay any draws on the Secondary Facility Loans in the event that the Company (i) issues or incurs any indebtedness (other than Permitted Indebtedness (as defined in the Orion Credit Agreement)) (“Debt”) or (ii) issues or sells any capital stock or any option, warrant or other instrument, security or right that is convertible into or exercisable or exchangeable for capital stock (“Equity”), by applying 100% of the net proceeds of any such Debt issuance and 50% of the net proceeds of any such Equity issuance to pay down the outstanding amounts under the Secondary Facility Loans. As of September 10, 2020, the Company has not made any draws under the Secondary Facility Loans. Connecticut Green Bank Loans As of October 31, 2019, the Company had a long-term loan agreement with the Connecticut Green Bank, providing the Company with a loan of $1.8 million (the “Green Bank Loan Agreement”). On and effective as of December 19, 2019, the Company and Connecticut Green Bank entered into an amendment to the Green Bank Loan Agreement (the “Green Bank Amendment”). Upon the execution of the Green Bank Amendment on December 19, 2019, Connecticut Green Bank made an additional loan to the Company in the aggregate principal amount of $3.0 million (the “December 2019 Loan”), which is to be used (i) first, to pay closing fees related to the May 9, 2019 acquisition of the Bridgeport Fuel Cell Project and the Subordinated Credit Agreement (as defined below), other fees, and accrued interest from May 9, 2019, totaling $0.4 million (“Accrued Fees”), and (ii) thereafter, for general corporate purposes as determined by the Company, including, but not limited to, expenditures in connection with the project being constructed by Groton Station Fuel Cell, LLC (“Groton Fuel Cell”). Pursuant to the terms of the Green Bank Amendment, Connecticut Green Bank will have no further obligation to make loans under the Green Bank Loan Agreement and the Company will have no right to make additional draws under the Green Bank Loan Agreement. The Green Bank Amendment provides that, until such time as the loan (which includes both the outstanding principal balance of the original loan under the Green Bank Loan Agreement and the outstanding principal amount of the December 2019 Loan) has been repaid in its entirety, interest on the outstanding balance of the loan shall accrue monthly in arrears from the date of the Green Bank Amendment at a rate of 5% per annum until May 8, 2019 and at a rate of 8% per annum thereafter, payable by the Company on a monthly basis in arrears. The Green Bank Amendment further provides that the payment by the Company of the Accrued Fees (as described above) includes any shortfall of interest due but unpaid by the Company through and including November 30, 2019. Interest payments made by the Company after the date of the Green Bank Amendment are to be applied first to interest that has accrued on the outstanding principal balance of the original loan under the Green Bank Loan Agreement and then to interest that has accrued on the December 2019 Loan. The Green Bank Amendment also modifies the repayment and mandatory prepayment terms and extends the maturity date set forth in the original Green Bank Loan Agreement. Under the Green Bank Amendment, to the extent that excess cash flow reserve funds under the BFC Credit Agreement (as defined below) are eligible for disbursement to Bridgeport Fuel Cell, LLC pursuant to Section 6.23(c) of the BFC Credit Agreement, such funds are to be paid to Connecticut Green Bank, to be applied first to repay the outstanding principal balance of the original loan under the Green Bank Loan Agreement and thereafter to repay the outstanding principal amount of the December 2019 Loan, until repaid in full. The Green Bank Amendment further provides that the entire unpaid balance of the loan and all other obligations due under the Green Bank Loan Agreement will be due and payable on May 9, 2026 if not paid sooner in accordance with the Green Bank Loan Agreement. Finally, with respect to mandatory prepayments, the Green Bank Amendment provides that, when the Company has closed on the subordinated project term loan pursuant to the Commitment Letter, dated February 6, 2019, issued by Connecticut Green Bank to Groton Fuel Cell to provide a subordinated project term loan to Groton Fuel Cell in the amount of $5.0 million, the Company will be required to prepay to Connecticut Green Bank the lesser of any then outstanding amount of the December 2019 Loan and the amount of the subordinated project term loan actually advanced by Connecticut Green Bank. The balance under the original Green Bank Loan Agreement and the December 2019 Loan as of July 31, 2020 was $4.8 million. Bridgeport Fuel Cell Project Loans On May 9, 2019, in connection with the closing of the purchase of the membership interests of Bridgeport Fuel Cell, LLC (“BFC”) (and the 14.9 MW Bridgeport Fuel Cell Project), BFC entered into a subordinated credit agreement with the Connecticut Green Bank whereby Connecticut Green Bank provided financing in the amount of $6.0 million (the “Subordinated Credit Agreement”). This $6.0 million consisted of $1.8 million in incremental funding that was received by BFC and $4.2 million of funding previously received by FuelCell Energy, Inc. with respect to which BFC became the primary obligor. As security for the Subordinated Credit Agreement, Connecticut Green Bank received a perfected lien, subordinated and second in priority to the liens securing the $25.0 million loaned under the BFC Credit Agreement (as defined below), in all of the same collateral securing the BFC Credit Agreement. The interest rate under the Subordinated Credit Agreement is 8% per annum. Principal and interest are due monthly in amounts sufficient to fully amortize the loan over an 84-month period ending in May 2026. The Subordinated Credit Agreement contains representations, warranties and covenants. The balance under the Subordinated Credit Agreement as of July 31, 2020 was $5.2 million. On May 9, 2019, in connection with the closing of the purchase of the Bridgeport Fuel Cell Project, BFC entered into a Credit Agreement with Liberty Bank, as administrative agent and co-lead arranger, and Fifth Third Bank as co-lead arranger and swap hedger (the “BFC Credit Agreement”), whereby (i) Fifth Third Bank provided financing in the amount of $12.5 million towards the purchase price for the BFC acquisition; and (ii) Liberty Bank provided financing in the amount of $12.5 million towards the purchase price for the BFC acquisition. As security for the BFC Credit Agreement, Liberty Bank and Fifth Third Bank were granted a first priority lien in (i) all assets of BFC, including BFC’s cash accounts, fuel cells, and all other personal property, as well as third party contracts including the Energy Purchase Agreement between BFC and Connecticut Light and Power Company dated July 10, 2009, as amended; (ii) certain fuel cell modules that are intended to be used to replace the Bridgeport Fuel Cell Project’s fuel cell modules as part of routine operation and maintenance; and (iii) FuelCell Finance’s (a wholly-owned subsidiary of the Company and the direct parent of BFC) ownership interest in BFC. The maturity date under the BFC Credit Agreement is May 9, 2025. Monthly principal and interest are to be paid in arrears in an amount sufficient to fully amortize the term loan over a An interest rate swap agreement was required to be entered into with Fifth Third Bank in connection with the BFC Credit Agreement to protect against movements in the floating LIBOR index. Accordingly, on May 16, 2019, an interest rate swap agreement (the “Swap Agreement”) was entered into with Fifth Third Bank in connection with the BFC Credit Agreement for the term of the loan. The net interest rate across the BFC Credit Agreement and the swap transaction results in a fixed rate of 5.09%. The , 2020 resulted in a $0.04 million gain and a $0.5 million charge, respectively. The fair value of the interest rate swap liability at July 31, 2020 and October 31, 2019 was $1.1 million and $0.6 million, respectively. Finance obligations for sale leaseback agreements Several of the Company’s special purpose project subsidiaries previously entered into sale-leaseback agreements with PNC for commissioned projects where the Company had entered into a PPA with the site host/end-user of produced power, and CCFC2 entered into a sale-leaseback with Crestmark on February 11, 2020 (refer to Note. 11. “Leases” for additional information). Under the financing method of accounting for a sale-leaseback, the Company did not recognize as income any of the sale proceeds received from the lessor that contractually constitute payments to acquire the assets subject to these arrangements. Instead, the sale proceeds received were accounted for as financing obligations. The outstanding financing obligation balance as of July 31, 2020 was $49.3 million as compared to $45.2 million as of October 31, 2019. This change reflects the recording of the finance obligation with Crestmark and the recognition of interest expense, offset by lease payments and the payoff of the UCI Fuel Cell, LLC lease with PNC. As noted in Note 6. “Project Assets”, the Company paid off the lease with PNC for the UCI Fuel Cell, LLC equipment and the payment to repurchase the equipment prior to the end of the initial lease term resulted in the ownership of the equipment transferring back to UCI Fuel Cell, LLC. The payoff resulted in the recognition of the deferred gain of $1.8 million which is reflected as a Gain on extinguishment of financing obligation on the consolidated statement of operations. The outstanding financing obligation for the remaining leases includes an embedded gain which will be recognized at the end of each 10-year lease term or upon early termination if applicable. State of Connecticut Loan In October 2015, the Company closed on a definitive Assistance Agreement with the State of Connecticut (the “Assistance Agreement”) and received a disbursement of $10.0 million, which was used for the first phase of the expansion of the Company’s Torrington, Connecticut manufacturing facility. In conjunction with this financing, the Company entered into a $10.0 million promissory note and related security agreements securing the loan with equipment liens and a mortgage on its Danbury, Connecticut location. Interest accrues at a fixed interest rate of 2.0%, and the loan is repayable over 15 years from the date of the first advance, which occurred in October of 2015. Principal payments were deferred for four years from disbursement and began on December 1, 2019. Under the Assistance Agreement, the Company was eligible for up to $5.0 million in loan forgiveness if the Company created 165 full-time positions and retained 538 full-time positions for two consecutive years (the “Employment Obligation”) as measured on October 28, 2017 (the “Target Date”). The Assistance Agreement was subsequently amended in April 2017 to extend the Target Date by two years to October 28, 2019. In January 2019, the Company and the State of Connecticut entered into a Second Amendment to the Assistance Agreement (the “Second Amendment”). The Second Amendment extends the Target Date to October 31, 2022 and amends the Employment Obligation to require the Company to continuously maintain a minimum of 538 full-time positions for 24 consecutive months. If the Company meets the Employment Obligation, as modified by the Second Amendment, and creates an additional 91 full-time positions, the Company may receive a credit in the amount of $2.0 million to be applied against the outstanding balance of the loan. However, based on the Company’s current headcount and plans for fiscal year 2020 and beyond, it will not meet this requirement or receive this credit. The Second Amendment deletes and cancels the provisions of the Assistance Agreement related to the second phase of the expansion project and the loans related thereto, but the Company had not drawn any funds or received any disbursements under those provisions. A job audit will be performed within 90 days of the Target Date. If the Company does not meet the Employment Obligation, then an accelerated payment penalty will be assessed at a rate of $18,587.36 multiplied by the number of employees below the number of employees required by the Employment Obligation. Such penalty is immediately payable and will be applied first to accelerate the payment of any outstanding fees or interest due and then to accelerate the payment of outstanding principal. In April of 2020, as a result of the COVID-19 pandemic, the State of Connecticut agreed to defer three months of principal and interest payments under the Assistance Agreement, beginning with the May 2020 payment. These deferred payments will be added at the end of the loan, thus extending out the maturity date by three months. Webster Bank Loan In November 2016, the Company assumed debt with Webster Bank, National Association (“Webster Bank”) as a part of a project asset acquisition transaction. The balance outstanding as of October 31, 2019 was $0.5 million. The loan was paid off and extinguished during the three months ended January 31, 2020. Enhanced Capital Loan On January 9, 2019, the Company, through its indirect wholly-owned subsidiary TRS Fuel Cell, LLC, entered into a Loan and Security Agreement with Enhanced Capital Connecticut Fund V, LLC (“Enhanced”) in the amount of $1.5 million. On January 13, 2020, TRS Fuel Cell, LLC and Enhanced entered into a payoff letter pursuant to which the loan was paid off and extinguished on January 14, 2020 . Fifth Third Bank Groton Loan On February 28, 2019, the Company, through its indirect wholly-owned subsidiary, Groton Fuel Cell, entered into a Construction Loan Agreement (as amended from time to time, the “Groton Agreement”) with Fifth Third Bank pursuant to which Fifth Third Bank agreed to make available to Groton Fuel Cell a construction loan facility in an aggregate principal amount of up to $23.0 million (the “Groton Facility”) to fund the manufacture, construction, installation, commissioning and start-up of the 7.4 MW fuel cell power plant for the CMEEC located on the U.S. Navy submarine base in Groton, Connecticut (the “Groton Project”). The total outstanding balance under the Groton Facility as of October 31, 2019 was $11.1 million. This balance was paid off, the loan was extinguished, and the Groton Facility was terminated during the three months ended January 31, 2020. Liberty Bank Promissory Note On April 20, 2020, the Company entered into the PPP Note, dated April 16, 2020, evidencing a loan to the Company from Liberty Bank, under the CARES Act, administered by the SBA. Pursuant to the PPP Note, the Company received total proceeds of approximately $6.5 million on April 24, 2020. In accordance with the requirements of the CARES Act, as amended by the PPP Flexibility Act, the Company is using the proceeds primarily for payroll costs. The PPP Note is scheduled to mature on April 16, 2022, has a 1.00% per annum interest rate, and is subject to the terms and conditions applicable to loans administered by the SBA under the CARES Act, as amended by the PPP Flexibility Act. Monthly principal and interest payments, less the amount of any potential forgiveness (as discussed below), will commence on November 16, 2020. The Company did not provide any collateral or guarantees for the PPP Note, nor did the Company pay any facility charge to obtain the PPP Note. The PPP Note provides for events of default, including, among others, those relating to failure to make a payment when due under the PPP Note, failure to comply with any provision of the PPP Note, bankruptcy, and breaches of or materially misleading representations. Upon the occurrence of an event of default, Liberty Bank may require immediate payment of all amounts owing under the PPP Note, collect all amounts owing from the Company, and pursue other remedies. The PPP Note may be prepaid at any time with no prepayment penalties. Under the requirements of the CARES Act, as amended by the PPP Flexibility Act, proceeds may only be used for the Company’s eligible payroll costs (with salary capped at $100,000 on an annualized basis for each employee), rent, mortgage interest and utilities, in each case paid during the 24-week period following disbursement. In accordance with the requirements of the CARES Act, as amended by the PPP Flexibility Act, at least 60% of the proceeds used by the Company were used to pay eligible payroll costs. The loan may be fully forgiven if (i) proceeds are used to pay eligible payroll costs, rent, mortgage interest and utilities and (ii) full-time employee headcount within 30 days after the last day of the loan forgiveness period as designated under the PPP regulations in effect as of June 6, 2020 While we may apply for forgiveness of the PPP Note in accordance with the requirements and limitations under the CARES Act, as amended by the PPP Flex |