back of yesterday on Thanks, and very ParĂ¡ to Page here had and pretty operational. kind our State in the in with we now Brannen, the terminal were the everyone. actually you the to great that stood terminal morning. try Minister the Governor cool the excited contracts hello, I'm of here Energy have. and see announce a And and that look shore Mines XX FSRU and we Good that highlight on was from and at of X I can Barcarena how Brazil. to event of is big Wes the here,
Alumina Alunorte Hydro. XX-year the see a here TBtus. side sell left the on to the of we the have refinery you can page, where That's Norsk by XX on top So owned agreement
cite and will the little which bit operations PPA. in is complete. current July then call power Selva land, reach of we're Denim we we And that commercial to and going the the XX% on gigawatt a that a X.X from XX-year our new to and have Moving COD XXX-megawatt XXXX the bought PPA. XXXX PPA just has [ July right, ], is That right, That plant, where will Capital Energy. year, to SEVA XX-year the to adjacent next a
to And also then X So us compact very on overall this model, be terminal. for kind here super development. business to industrial levels to of great able see just in open exciting the many
extended you jetty. here picture, As offshore what the too, really can from is an did we see
a just in Celsius, advantaged and of So is FSRU finished completion a from in cost Singapore. this converting it the Energos we which benefits very yard project.
arrived X And been Santa so we're the ago, ready outdone, X that flow a in obviously gas to you to another the very been hooked in and few so development in FFSR, of next for operational. we're announcing fully years. page on up, Catarina terminal We've is days be exciting.
Not think Barcarena, I now and both they've for working and years, these permitting is
are within day but each totally planned, did other. and getting of a arrive of basically also each day they hooked And so other not up a within
great goes But connected pipeline the basically, kilometers project for big here. another actually in more as the on here, water system you We'll pictures left until this then into and pipeline is So the in show under the XX the Brazil. transport connects and it see, can future. here. into another
only the NFE. at of but the through is it us. for connected power in So globally. about Brazil, a terminal we're for very to to being going of really Wes for of of to that. super Page this to best different really We're it sort one I'm few reasons that's pipeline scale XX. this which very, about other LNG excited best flip And to we remember the dynamic system, is very one Very terms to opportunity alluded talk walk thing now here.
I'll a exciting is the and is in opportunities believe going it. opportunities, not liquid unprecedented
things in why I this X love we terms right. of to to from highlight are there left want So opportunity that
Brazil. time And a in number, modest maybe even consumption. new like very of the of interesting is sounds year-over-year grid XX world. is XX% We're energy to yesterday for what some Energy of for renewables they're power lot a stat. actually X% What need There's growth probably has XX X% a grid just Brazil by demand overall the number. in of a like is you're and is of the this a and at peak dispatchable but the X a might almost It of with when really rest increase come we is XX%, forecasting Ministry talking power about spent future for that electricity many be into the gigawatts, of the gigawatts a first of then there hydro. actually kind XXXX. I the ways So huge the
they so clean grid grid is And a actually a very their problem have and low-cost very capacity. and
And so more grow firm is which what up to what is they need as they provide. NFE capacity, set
thing is really mechanism second new power. the for acquiring The
a Brazil So contracts history acquiring has for capacity. great long-term of power
and gigawatts auctions than So prices. LNG in different gigawatts. over XXXX, we a very these And XX have the X XX XXXX, contracts for have because index highly sophisticated international expect since bankable been to price gas new auction they're more awarded the In auctions. these are
in is in really power. for us mechanism of setup, to bankable this well a to long-duration So and give unique understood for LNG very contracts the well out terms world
is the local capital markets. robust third The
that the we what are Brazil and so that PPAs is see capital support banks in in places of these And long-duration really auctions. a willing are that one other to in we government lot don't see markets
competitive that's able We to gigawatts significant of X.X CapEx is is what project this Brazil gigawatts. our build our X And majority asset participate to level we're the financing up project. us going in support Selva year, continue with portfolio, where or and finance to power these from this Development the gigawatts the financed do which Bank, which debt. in is called allows We really BNDS, to we X have auctions, think today
put of about just U.S., couple we to a still the compare sort saying and been the right, to the the demand. thing same we've of stats it's On
is So and to the talk Brazil XX, about underline energy to of the a about capita it's opportunity bit to here. our a and more in Xx.
Flipping the about trying grid -- just has population X/X use per U.S. little growth, Page
low-cost can about a you what real rains, thing and these out left hydro projects. the to and XX% low see it grid. renewables. understand job Brazil. power, the power side, on When amazing building the mentioned emissions I are That's of in They've So very that's done also is great
the on renewables XX% grid. So
in means that XX% case grid what of seasonal intermittent or the of However, in is the the case hydro renewables. either of is
credit to for dispatchable out basically what is very has thermal which which And even that the renewables building firming grow Brazil is power more. on so been capacity provides focused and capacity, hydro the to allows and entire their grid, the
On that the the right problem side they've had. is
So is, very with these intermittent what a had all energy price. that you've volatile sources, means
here. so And grasped that we've
that's the correlation between You lot many inverse fast done basically one the thinks and is can just has problem a hydro how price. see The thing things. and this they've spot storage difficult about Brazil grown. been
know things that that the to many enough when for Today, were of years. of XX plants would storing the one these that about built, we're first last so And is energy capable lasts reservoirs hydro days. Brazil storage
And keep capacity been with up growth to now for very to XX. so in the it's Brazil.
Flipping hard
is of there opportunity in Brazil underline the the gas. One enough really isn't things
So is in there's to lot gas capacity. gas There's both Brazil today. and a industrial power of for enough but go use for this a industrial not the economy thermal around use, gas there
to you they've the it's to build up LNG opportunity this capacity is, And reason it, build development. the continue is been for do so hard haven't to out the enough great that gas firm to tried hence, had
NFE ways. has focused distinct in opportunity identified very X and this
On side, we're trying the what strategy. regional left is underline our to
is all most complex, a LNG XX-year the which exports and where out resources mining power gas and amidst region, the we see which far industrialized for import gigawatt is become demand increasing will Barcarena for with top, a it exists from will pipeline X.X then TBtu place of a very go regional LNG for the where targeted XXXX. and constraints or highly At Barcarena XX acquisition supply any in onshore of the Brazil. perfect hub contract, terminal demand. be our is the LNG, gas the Golar regional agricultural gas region in only So point of we've the
to that the continue regional for power started import states. is other So and Santa the targeting, at really in Catarina off-takers now to neighboring what we've There develop point we're then we opportunity industrial highlight we're the region.
And want are main that terminal. the we'll LNG in
and about existing that to supply, thing that. great of not the pipeline gas X.X the firm need per supplier. plants gigawatts all there's Catarina supply going Also, competitive our obviously $XX XXX against all over system. power to be and is pipeline taxes or we So that that, of and Santa TBtu in, want that's PPAs. from plants including know hope do be We do Those greater industrial connected we connection, a fees. MMBtu demand have win are through gas in to PPAs transport tariff to today pay folks they're to very Those can when than
as journey our those to exciting horizon. watch, so start the in things Catarina, X And we and Santa opportunities are now the on have we
coming is the are side highlight, which right to I second auctions the year. power opportunity that the want On this is
dark new So forecast Brazil for of The need dispatchable here existing of light bars out to power. by for power XXXX. the are XX XXXX. the going Brazil the And retirement the is estimates the thermal government gigawatts blue capacity need blue
developer of business. new current our auction we're gas.
Page XX a And We kind expect of to summer this of gigawatts power as highlights start as and a firm to terminals, in more auction, both our at in highlighting X bidder a away there supplier of we this. be an expect to be or X that chipping
X that we turn wanted side, going current to just left the are next through to have on that we years. the So contracts over on walk the
Hydro XXXX, run COD plant XX-year has a XX-year we contracts X.X Buckarena PPA, will supply, gives contract go see power an PPA. power we ] in of So a then years. contract. And XXXX, a have fully will us these gigawatt XX XXX-megawatt of XX OD XX-year at gas average contract In the Selva for turning to TBtu on is once we're in Norsk EBITDA XX we'll now in that contracted that gigawatts on XXXX. XBs with our $XXX all X.X duration. That That and equates rate million which [
went the growth the near-term side On right through. I is just
to want need for a it capacity supply some there's super announced is mechanism markets to that of that declining. Page just our are and So And we regional go Catarina, sophisticated quick on have most XX, through Then Brazil which fuel we're great the gas a acquire the constraints also on new local highlights supply, comes we in supportive. strategy. with and capital the that on power 'XX. Santa overall Barcarena, on in plays December importer.
I acquisition Bolivian into only how from
power XX NFE? The and is leverages million. is here doing is a $XXX great these when called for we're what energy Why first X.X-gigawatt was generate JKM. of cycle one this such that we're It's of So payment it simple in infrastructure. that price a a capacity And pay on in acquiring to opportunity our for XXXX. gas contract auctions won has of Brazil a contract a existing of approximately XXX% years
unable don't of spot power respond able power a we're baseload if have on in to has terminal supply also demand this supply. if the response X.X supply developer to Hydro, like won basis really, our these already supply. gigawatts the for were to who had gaps because this this our terminal find we leverage Norsk was then to great to contract able that and leverage It's gas with hard existing case capacity. you saw a We to a So complete contracts but move gas existing through opportunity really and contract, contracts he flowing
And gas supply over kind so the it a whole of shows of and X.X really terminal both gigawatts how works industrial of together complex to support power.
operational leverage. to is demonstrate significant our third just the So piece
we So place, have and when the in XXX of of we the already contracts add XX this the contract megawatts to BTUs Barcarena, power. gas X
terminal And the paying this from and So our for straight to expenses. now already of FSRU including we're of what really drops make we'll contract the all line expenses, bottom Barcarena.
this So have expect opportunity PPA to you, bodies to made great Chris. us. very Brazil. to it here March.
Thank collaboratively with We're transfer progress the regulatory for We've to regulatory a working I'll really in and and in Barcarena turn exciting sign-off